What Is a Schedule Change Log?

A schedule change log is the audit trail that records every time a job's plan is created, rescheduled, swapped, overridden, closed, or reopened, and why.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Setup Sub-Phase in Changeover Tracking?

A setup sub-phase splits one changeover into timed stages, teardown, fixture, tools, first article, QA hold, and run-off, so a shop can see where setup time really goes.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Step Override in Quote Scenarios?

A step override is a per-scenario change to one routing step's setup, run time, or work center inside a quote, so a what-if option can be priced without altering the base routing.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is an Overtime Allowance in Shift Scheduling?

An overtime allowance is a shift's declared ceiling on hours per day and its flag for whether overtime is permitted, a stated limit that documents intent for the schedule.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Holiday Scope in Scheduling Calendars?

Holiday scope is the level a non-working day applies to, plant-wide, one shift, or one work center, so the scheduler removes capacity from exactly the right resources.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Job Status in Manufacturing Scheduling?

Job status is the top-level state of a manufacturing order, from scheduled through in progress and completed, that tells a planner where the work stands right now.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Move Time in a Routing?

Move time is the physical transport time between operations on a routing step, counted in a job's total-time and cost estimate but not in the engine's capacity allocation.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Shift Time in Production Scheduling?

Shift time is a single day's working slot inside a shift, a start, an end, and a break, that the scheduler decodes into the productive hours a work center has that day.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Teardown Time in a Routing?

Teardown time is the cleanup and dismantling time at the end of a routing step, counted in a job's total-time and cost estimate but not in capacity allocation.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Continuous-Process Work Center?

A continuous-process work center runs flowing product you cannot count in transfer batches. Learn how the flag changes which lot-streaming model a schedule applies.

July 31, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Downtime Event in Production Scheduling?

A downtime event is a period when one work center is unavailable, planned or unplanned. How downtime removes capacity, reroutes jobs, and how you enter it in the current release.

July 31, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Plant Holiday in Production Scheduling?

A plant holiday is a non-working day that removes capacity from every work center at once. Learn how plant, shift, and machine holidays differ and how they shape a schedule.