Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC How-To
EDGEBIC How-To

How to Check a Job's Progress in EDGEBIC

Checking a job's progress in EDGEBIC takes two reports: Job Progress for the headline percent, and Work Center Progress for which step is holding the missing part.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Check What a Scheduling Run Changed in EDGEBIC

Check what a scheduling run changed in EDGEBIC: read the confirm dialog and failure list, compare grid dates, and open the job audit trail for the full history.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Complete an Operation in EDGEBIC

Complete an operation from the terminal or the planner desktop, understand the end-of-day snap, and see why completion is a statement not a side effect.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Connect Two Steps in the Routing Designer in EDGEBIC

Connect two steps in the EDGEBIC routing Designer: turn on Draw Connector, drag from one node to the next, and set the connector type so the scheduler reads it right.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Copy a Routing to Another Product in EDGEBIC

Copy a routing to another product in EDGEBIC: a routing belongs to one product, so you create the target's own routing and rebuild the steps, fast, with the tools built for it.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Correct a Wrong Actual Date in EDGEBIC

Correct a wrong actual date on an operation: fix the start, fix the end, handle inverted pairs, and reschedule so downstream work follows the truth.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Create a Department in EDGEBIC

Create a department in EDGEBIC to group work centers for capacity roll-up: the Department Details dialog, the required fields, and why it never blocks scheduling.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Create a Manufacturing Order in EDGEBIC

Create a manufacturing order in EDGEBIC: the Add Order dialog field by field, why start time defaults to midnight, and what the grid shows after you save.

July 26, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Create a Product Category in EDGEBIC

Create a product category in EDGEBIC from the Manage Product Categories window or straight from the product form, and use it to group and filter the catalog.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Deactivate a Product Without Losing History in EDGEBIC

Retire a product in EDGEBIC without deleting it: the active flag, why deletion cascades to routings and schedule rows, and how to bring a product back.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Delete a Routing Step Safely in EDGEBIC

Delete a routing step in EDGEBIC without breaking the chain or orphaning scheduled work: relink the predecessor, save, reschedule, and check the anomalies report.

July 26, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Enter Actual Hours for Yesterday in EDGEBIC

Enter actual hours for yesterday or any past day: use the daily grid, log outside the planned window, and answer the prior-days prompt correctly.

July 26, 20266 min read
Let's Solve Your Challenges Together