Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Quoting & Promising
Quoting & Promising

What a Quote's Estimated Cost Does Not Include in EDGEBIC

A quoted cost in EDGEBIC is labor plus material, and nothing else. See what the model deliberately leaves out, and where those real costs belong instead.

August 14, 20267 min read
Outcomes & ROI
Outcomes & ROI

What a Rising Backlog Tells You Weeks Before a Job Is Late

Backlog is the queue length in front of a station, and its slope is a leading indicator. Here is the causal chain from a rising number to a late job, and how to measure your own warning lead time.

August 14, 20269 min read
Shop Floor Execution
Shop Floor Execution

What an Over-Estimate Warning on a Step Actually Means

A finished step that used more hours than planned raises a warning on its Actual Live card. Learn the three causes behind it and how to tell which one you are looking at.

August 14, 20268 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Are Estimated Work Hours on a Quote?

Estimated work hours are the real work a routing consumes, not the elapsed span between quoted start and end dates. Learn why the two differ and which one prices a job.

August 14, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Are Job Status Buckets on a Dashboard?

Late, Overdue, On time, and Early are the four exclusive slices every job falls into. Learn what separates late from overdue and why the fix differs.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Are Production Hours in Shop-Floor Tracking?

Production hours are the run and rework time credited to a job, with setup, pause and downtime kept separately. Learn why the split protects operators and reports.

August 14, 20265 min read
Schedule Optimization
Schedule Optimization

What Happens When the CP-SAT Solver Is Not Installed

You selected the mathematical solver in Options but the badge still says best of N tried. That is a deliberate fallback, not a fault, and here is how to confirm it and what you keep.

August 14, 20268 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Blocker Hint on a Late Job?

A blocker hint is a one-line diagnosis on the Late Jobs report telling you where to dig first. Learn the three hints, what triggers each, and how to act.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Bootstrap Administrator Account?

The bootstrap administrator is the first account, created before anything else on a new database. Learn why it cannot be deleted and how to hand it over safely.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a BOR Split Around an Anchor Step?

A BOR split divides a routing into the steps feeding a pinned constraint and the steps after it, so one half schedules backward and the other forward from the same point.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Common Shift Requirement in Parallel Scheduling?

Machines that must run one operation together need a shared shift record, not just matching hours. Learn why identical shift times on separate records never intersect.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Credit Limit in Manufacturing Software?

A credit limit is the ceiling on what a customer may owe. In EDGEBIC it warns but never blocks an order. Learn what that means and how to use it well.

August 14, 20266 min read
Let's Solve Your Challenges Together