Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Make-to-Order Shops: Scheduling Backward From the Due Date

Make to order backward scheduling: pull each job to finish just in time, cut work in process, and get told before you promise when a due date simply will not fit.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Medical Device Scheduling: Planning on Operator Hours, Not Just Head Count

Medical device operator hours scheduling tracks a per-person hours ledger, so a plan books only the certified-operator time you have and slides work when it runs out.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Metal Fabrication Quoting: Promise Dates From a Real Capacity Simulation

Metal fabrication quoting software simulates the job against live shop capacity, so a fab shop quotes lead time and cost from a real schedule, not a gut feel.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Packaging Lines: Scheduling Machines That Must Run in Lockstep

Packaging multi-machine line scheduling runs filler, capper, and labeler in synchronized lockstep, or splits a job across duplicate lines to finish in half the time.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Plastics Scheduling: Modeling Mold Cavities and Pieces-Based Capacity

Plastics cavity capacity scheduling models a multi-cavity mold as machine instances and schedules by pieces per hour, so the plan matches real molding throughput.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Print Shop Quoting: Turn a Job Around With a Real Press Schedule Behind It

Print shop quoting software simulates the job against your live press load, so a quick-turn quote carries a lead time and price the shop can actually hit.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Tool and Die Shops: Scheduling When Setup Runs the Job

Setup heavy scheduling for tool and die shops: price each machine's real changeover by sequence so plans stop assuming an average that is wrong in both directions.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Certified Operators in Aerospace Manufacturing

Aerospace operator certification scheduling: the schedule stops booking five Inconel jobs against one certified welder and starts showing the real slip.

July 25, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Traceable Routings for Aerospace and Defense Work

Aerospace routing traceability scheduling: every job keeps the exact routing it was scheduled with, so an engineering change cannot silently re-route live work.

July 25, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Protecting Delivery Dates on Long Aerospace Routings

Aerospace production scheduling constraints: pin the autoclave to its date and size buffers so a slip at step three does not cost you the delivery.

July 25, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Routing CNC Work to the Next Available Machine

CNC alternate machine routing: how a fallback machine gets chosen before allocation using projected finish times, its own cycle time, and its own setup.

July 25, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Lights-Out CNC Machining

Lights out machining scheduling needs an operator model that books the setup and frees the run, so one attendant starts seven cells without being oversold.

July 25, 20269 min read
Let's Solve Your Challenges Together