My Job Finished After Its Due Date: Why, and What to Do

A job scheduled past its due date has a handful of documented causes: capacity, direction, the lead-time tail, or a promise that never fit. How to tell which, and the fix for each.

July 26, 20267 min read
Troubleshooting
Troubleshooting

Setup Time Looks Wrong on a Job: Reading the Changeover Trail

A setup time that seems off usually traces to which resolver level fired. How to read the setup source, tell a matrix hit from a fallback, and fix a matrix that is not being applied.

July 26, 20267 min read
Troubleshooting
Troubleshooting

The Gantt Is Blank After a Run: Display, Data, or a Failed Run

An empty Gantt after scheduling is usually a view problem: a date window, a job filter, or inverted actual dates. How to tell a hidden schedule from a run that produced nothing.

July 26, 20267 min read
Troubleshooting
Troubleshooting

The Import Reported Failed Rows: Reading and Fixing Them

Failed rows in an import come from a short list of causes: a required cell blank, an unmapped mandatory field, or an abort setting. How to read the log and fix each.

July 26, 20267 min read
Troubleshooting
Troubleshooting

The Schedule Ignored My Alternate Work Center: Why, and the Fix

An alternate machine that never gets used has a few documented causes: the primary was faster, the alternate is inactive, a planner pin overrode it, or it was configured as the wrong type.

July 26, 20267 min read
Troubleshooting
Troubleshooting

Two Jobs on the Same Machine at the Same Time: Real or By Design?

Overlapping jobs on one machine are sometimes legitimate and sometimes a collision. How to tell a mirrored parallel operation from a genuine double-booking, and how to fix the real ones.

July 26, 20267 min read
Troubleshooting
Troubleshooting

Actual Dates Look Wrong: Tracing What the Shop Floor Really Reported

Actual dates wrong in production tracking? Auto-filled steps, end-of-day stamps, and mirrored parallel dates explain most cases. Trace each to its source.

July 23, 20267 min read
Troubleshooting
Troubleshooting

A Work Center Shows Zero Capacity: The Checklist

Work center zero capacity is almost always configuration: instances, shifts, daily hours, calendars, or utilization. The six-point checklist that finds it fast.

July 23, 20266 min read
Troubleshooting
Troubleshooting

A Job Got Scheduled on a Holiday: Here's Why

A job scheduled on a holiday almost always means the calendar changed after the scheduling run. The four holiday layers, how to confirm, and the one-step fix.

July 23, 20266 min read
Troubleshooting
Troubleshooting

Idle Gaps in the Schedule: Waste or By Design?

Gaps in a production schedule can be queue buffers, shift boundaries, or real waste. How to tell intentional gaps from lost capacity, and what to do about each.

July 23, 20266 min read
Troubleshooting
Troubleshooting

Steps Scheduled Out of Sequence: Diagnosing Dependency Problems

Operations scheduled out of order have four causes: display sorting, intentional overlap, broken step links, or a real violation. How to tell them apart fast.

July 23, 20267 min read
Troubleshooting
Troubleshooting

Why Did My Job Jump 2 Days After a Reschedule?

Your job moved after a reschedule and the new end date looks wrong. Here are the four real causes, how to confirm which one you have, and the fix for each.

July 23, 20267 min read