Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

Scheduling Concepts
Scheduling Concepts

Hours-Based vs Piece-Based Capacity Modeling

Hours-based vs piece-based capacity modeling: when to size a work center by time, when by output rate, when by both, and worked capacity numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Frozen Routing Snapshot Protects a Running Job

Why EDGEBIC saves an exact copy of the routing each job was scheduled with, so a mid-order engineering change never silently re-routes an operator's remaining steps.

July 29, 20267 min read
Scheduling Concepts
Scheduling Concepts

How a Quote Simulation Produces a Realistic Date

Why an EDGEBIC quote date holds up: the simulation borrows the live scheduling engine, runs against real capacity in memory, writes nothing, and reports the same date the real run gives.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Schedule Accounts for Holidays and Downtime

How EDGEBIC turns shifts, three levels of holidays, downtime windows, and capacity overrides into the effective hours a work center has on any given day.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Scheduler Decides Which Job Runs First

How a scheduler decides which job runs first: the priority, start date, due date sort, deterministic tie-breaking, and how dispatch rules fit in, with worked numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Scheduler Nets Demand Against Inventory

How EDGEBIC checks on-hand stock before it schedules a build: the append-only ledger, consume-from-stock netting, and how it avoids double-allocating the same units.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Scheduler Preserves Completed Work

Why a reschedule in EDGEBIC never moves finished operations: the three-zone model that freezes completed work, forward-shifts partial work, and re-plans only what has not started.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Scheduler Recovers From a Mid-Shift Disruption

How a scheduler recovers from a mid-shift disruption: the three zones of a reschedule, why completed work never moves, and worked reschedule numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Finite Capacity Scheduling Handles a Shared Bottleneck

How finite capacity scheduling handles a shared bottleneck: why the constraint runs one job at a time, how load factor finds it, and how jobs queue, with numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Mathematical Optimization Improves a Schedule

How EDGEBIC searches for a better job order: a multi-run heuristic layer guaranteed never worse than the baseline, and a CP-SAT solver that reports a proven optimality gap.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Multi-Shift Allocation Fills Capacity

How EDGEBIC spreads one operation across shifts, days, and machine instances: the per-shift capacity bucket, the priority search, and the three ways it splits work.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Operator Skills Constrain a Schedule

How EDGEBIC adds people as a second finite resource: a per-operator hours ledger that stops one certified welder from being scheduled on five machines at once.

July 29, 20268 min read