What Is a Plan Inversion in Scheduling?

A plan inversion is a schedule or booking that ends at or before it starts. Definition, the usual cause in actual-time reporting, and how EDGEBIC flags it.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Production Schedule? Definition and Example

A production schedule is the engine's dated plan of every operation for a job, bundled with the routing snapshot it was built from. Definition and worked example.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Reason Code in Production Tracking? Definition and Example

A reason code is a short selectable label that records why a job paused or stalled: machine, material, quality, or waiting. Definition, an example, and how EDGEBIC uses it.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Replenishment Suggestion in Inventory Planning?

A replenishment suggestion is the system's recommended build quantity when projected stock falls below a trigger. Here is how suggestions are sized and firmed.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Routing Snapshot? Definition and Example

A routing snapshot is a frozen copy of a product's routing saved with a schedule, so later routing edits never rewrite finished plans. Definition and example.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Scheduling Anomaly? Definition and Examples

A scheduling anomaly is a schedule-quality or configuration problem a validator flags for review. Definition, categories, severity levels, and how EDGEBIC surfaces them.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Scheduling Mode? Definition and the Five Modes

A scheduling mode is the scope a scheduling run applies: add-only, full replan, or preserve near-term. Definition of the five modes and how EDGEBIC chooses one per run.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Scheduling Policy? Definition and Examples

A scheduling policy is the site-wide rulebook that governs how the engine behaves. Definition, what it controls, and how EDGEBIC applies one policy across every run.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Selection Strategy in Scheduling?

A selection strategy is the rule that picks which machine in a pool runs a step. Learn how earliest completion, primary first, and earliest start differ.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Shop Floor Kiosk? Definition and Example

A shop floor kiosk is a terminal where operators start, pause, and finish jobs so actuals flow back to the schedule. Definition, punch types, an example, and how EDGEBIC uses it.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Sub-Assembly in Manufacturing? Definition and Example

A sub-assembly is a component that is itself manufactured through its own routing and then fed into a parent job. Definition, a worked example, and how EDGEBIC uses it.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Time Fence in Planning? Demand and Planning Fences

A time fence is a horizon inside which the plan behaves differently to protect the near term. Here is how demand and planning fences work in production planning.