Master Production Schedule (MPS) Software

A master production schedule says what you will build, how much and when, over the next weeks and months. Master production schedule software turns demand into that plan, tests it against the capacity you actually have, and hands the result to MRP so purchasing buys for production that can really happen. Plan on infinite capacity instead and every number downstream inherits the error.

EDGEBIC (RMDB 2.0) by User Solutions builds the master schedule to finite capacity, levels the load, and drives MRP from it. Horizons of six months to two years, what-if scenarios before you commit, one-time license from $25,000.

Last updated

EDGEBIC job Gantt view showing scheduled production jobs across a timeline with planned dates
Job Gantt View: what ships this week, which jobs are late and which are safe

Why Most Master Schedules Do Not Survive Contact

Most master production schedules are built on infinite capacity assumptions, which turns the production plan into a wish list. The schedule looks complete, MRP dutifully raises purchase orders against it, and then the plant discovers in week three that the hours were never there. The symptoms are consistent:

  • The master schedule assumes capacity the plant does not have
  • MRP orders material for production that cannot run on that date
  • Capacity bottlenecks surface only once production is behind
  • The real master schedule is a spreadsheet one person maintains
  • New demand cannot be evaluated against existing commitments
  • Some areas run overtime while others sit idle in the same week

Three Ways to Build a Master Production Schedule

What separates them is not the horizon or the report pack. It is whether the plan was ever tested against real capacity before MRP was allowed to act on it.

Spreadsheet MPSERP MPS moduleEDGEBIC
Capacity checkNone, or a rough hours totalRough-cut at best, usually infinite capacityFinite: machines, labor, materials and tooling
What the plan is tested againstLast quarter plus judgementFixed lead times per itemReal remaining capacity, period by period
Taking on new demandRebuild and hopeRerun the regen and read the exceptionsWhat-if scenario in memory, compared with the live plan
Handoff to MRPRe-keyed by handAutomatic, from an unfeasible planAutomatic, from a capacity-feasible plan, material pegged
HorizonWhatever the sheet coversUsually the ERP planning horizon6 months to 2 years (Nimitz: 2-year dry dock cycles)
Level loadingManual smoothingRarelyLevel loads resources and names the bottleneck
PricingFreeIncluded in the ERP$25,000 APS, $35,000 Complete with MRP, one time

RMDB and EDGEBIC: Master Scheduling on Finite Capacity

RMDB generates master production schedules that respect real constraints. An operation is scheduled only when machines, labor, materials and tooling are available, so the master plan is something the plant can execute: accurate MRP, promise dates that hold, and level resource loading instead of alternating overtime and idle time. EDGEBIC keeps that engine and adds the optimizer and the what-if workbench around it.

  • Finite capacity master scheduling across every resource type
  • Planning horizons from 6 months to 2 years and beyond
  • Schedule optimization with configurable priority rules
  • Resource level loading to balance work centers across periods
  • What-if scenarios to evaluate new demand before committing
  • MRP driven by an achievable production plan, with material pegging
  • Bottleneck identification before delivery is affected
  • Gantt and resource views of the whole horizon
  • Forward scheduling from today or reverse from due dates
  • Re-plan as orders, capacity and actuals change
EDGEBIC optimizer workbench building a what-if variant with weekend work, longer days, added machines or outside operations
Optimizer Workbench: test a what-if variant in memory and compare it with the plan you run today

From Demand to Material: Where the MPS Sits

Demand becomes a master schedule, the master schedule becomes a material plan, and the material plan becomes purchase orders and work orders. EDGEBIC Complete runs the whole chain on one model, which is why the material plan stops contradicting the capacity plan.

  1. 01Demand. Firm orders and forecasts come in from your ERP, Excel or CSV.
  2. 02Master production schedule. Planned output by item and period, tested against finite capacity and leveled.
  3. 03MRP. Requirements exploded through the bill of materials from the approved master schedule, with material pegged to the demand it serves.
  4. 04Execution. Operations sequenced on the planning board, actuals captured at the kiosk, the plan re-planned against them.

Deeper on each piece: what an MPS is and how to build one, MRP in EDGEBIC, MRP compared with APS and finite capacity scheduling.

Labor planned several months ahead across 33 locations, on one master schedule

Cummins Engine

A six-month labor horizon is only credible if the plan behind it knows what each site can really do. Cummins uses RMDB to hold that horizon across 33 US locations, with labor as a planned constraint rather than an assumption.

The result is a master schedule that purchasing, HR and the plants can all work from, and customer commitments that reflect capacity months before the week arrives.

Read the full story

They enable the user to quickly generate various 'what-if' plans for feasible and efficient master scheduling, all without disrupting the current system.

Arnold Quesenberry, Senior Consultant, A.G. Raymond & Co.

Master Production Schedule Results

Master production plan with realistic labor and capacity forecastsTechnical Glass Products
6 months
Scheduling horizon for dry dock cycles and maintenance planningUSS Nimitz
2 years
From raw ERP data to a complete optimized master schedulePlastilite Corporation
5 days
Master schedules with a 6-month labor planning horizonCummins Engine
33 sites

EDGEBIC Pricing: Published, One-Time

Two editions of EDGEBIC by User Solutions, both perpetual licenses with updates included and no per-seat annual fee. EDGEBIC is an installed Windows application, not a subscription service. See EDGEBIC pricing and editions or how this compares with the market.

EditionWhat it includesOne-time license
EDGEBIC APSFinite capacity scheduling and optimization: graphical routing designer, forward and backward scheduling, Theory of Constraints anchoring, parallel work centers, sequence-dependent setup, lot streaming, operator skills, and a two-layer schedule optimizer.$25,000
EDGEBIC CompleteEverything in EDGEBIC APS plus MRP, inventory, purchasing and material pegging, so material availability constrains the schedule alongside machines and labor.$35,000

Works Alongside Your ERP

Your ERP stays the system of record. Demand, items, bills of materials and work centers come into EDGEBIC from Excel, CSV or database tables; the approved master schedule and its material requirements go back out. No middleware and no custom API project. Step-by-step integration guides:

Using a different system? Any ERP that exports Excel, CSV or database tables works. See EDGEBIC ERP integration and the ERP scheduling add-on.

Frequently Asked Questions

See a master schedule built from your own numbers

Book a free live demo. Bring a forecast, your items and your work center hours, and watch a capacity-feasible master production schedule come together in the session.

Or see RMDB features, EDGEBIC by User Solutions or pricing and editions.

Request a free demo
Let's Solve Your Challenges Together