Multi-Location Manufacturing Scheduling

From 33 U.S. locations to international operations in Australia and China. Production scheduling that scales across your entire manufacturing network — with unified capacity visibility at every level.

33 Locations

Labor and machine scheduling across U.S. sites

Cummins Engine

U.S. + Canada

All major repair shops with 180,000+ unit fleet

GE Railcar Services

Australia + China

International expansion with rapid site deployment

Sleepmaster Ltd

Multi-Location Scheduling Challenges

Multi-location manufacturers face scheduling complexity that compounds with every site. Different workcenters, different labor pools, different shift patterns — all needing coordination for realistic customer promises and efficient resource utilization across the network.

  • No unified scheduling visibility across manufacturing sites
  • Each location using different tools (or no tools) for planning
  • Inability to evaluate cross-location capacity for new orders
  • New site deployment taking months with traditional ERP scheduling
  • Different sites with different workcenters, shifts, and capabilities
  • Management blind to network-wide bottlenecks and capacity gaps

How RMDB Schedules Across Multiple Locations

RMDB provides each location with its own scheduling configuration — workcenters, labor pools, production calendars, and routing rules — while giving management unified visibility across the entire network. New sites can be deployed in days, not months, even in international greenfield operations.

  • Per-site workcenter, labor, and calendar configuration
  • Unified capacity visibility across all manufacturing locations
  • Multi-month planning horizons (6+ months for workforce planning)
  • New site deployment in days — even internationally
  • Multi-user access with site-level and management-level permissions
  • Works with existing site-level ERP systems
  • Heat map and utilization views across all locations (EDGEBI)
  • Scalable from 2 sites to 33+ with no architecture changes
“We like the ability to define load and select a realistic promise date for our customers — we have already seen an increase in customer satisfaction.”

Joe Van Wagner, Production Manager

Cummins Engine — 33 U.S. locations

“RMDB required one individual very much part time (me) to set up on the critical areas for China and is now being run by a young Chinese manager who had no manufacturing experience.”

Jim Steel, Operations Manager

Sleepmaster Ltd — Australia + China

Multi-Location Results

33 Sites

Labor scheduling with 6-month planning horizon across all U.S. locations

Cummins Engine

30→90%

On-time shipping improvement across all U.S. and Canada repair shops

GE Railcar Services

Part-Time

International site deployed by one person, now run by local manager

Sleepmaster Ltd

Frequently Asked Questions

Ready to unify scheduling across your locations?

See how RMDB can bring finite capacity scheduling to your entire multi-location operation. Schedule a free consultation today.