Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Everything we have published.

EDGEBIC How-To
EDGEBIC How-To

How to Simulate Multiple Quotes at Once in EDGEBIC

Run quote simulation across a whole filtered list in EDGEBIC: the selection rule that decides which quotes are included, and how to read the summary.

August 8, 20266 min read
Troubleshooting
Troubleshooting

My Scenario Result Does Not Match the Live Schedule: Causes and Fixes

A what-if scenario runs in memory against a clean copy of the plan, so its dates can differ from the live schedule. The documented reasons a gap appears and what to check.

August 8, 20266 min read
Worked Examples
Worked Examples

Onboarding a New Product: From Blank Routing to First Scheduled Job

A new product onboarding walkthrough in EDGEBIC: create the product, build a six step routing with real hours, add the material, and schedule the first order end to end.

August 8, 20269 min read
Worked Examples
Worked Examples

Planning a Month of Preventive Maintenance and Scheduling Around It

A preventive maintenance walkthrough in EDGEBIC: list what is due, pick the cheapest days from the utilization heatmap, block the hours, and reschedule.

August 8, 20269 min read
Visual Scheduling
Visual Scheduling

Reading Parallel and Alternate Branches on the EDGEBIC Canvas

Three connector types, three very different meanings. How the EDGEBIC routing designer draws a sequential step, a parallel machine, and a true alternative.

August 8, 20268 min read
Worked Examples
Worked Examples

Rescheduling Around a Late Material Delivery, Start to Finish

A late material delivery walkthrough in EDGEBIC: move the material's ready date, reschedule one job, read the new promise, and reclaim the freed capacity.

August 8, 20269 min read
Visual Scheduling
Visual Scheduling

Sharing a Gantt Configuration Across Planners in EDGEBIC

Tune the schedule display once, then export it and import it everywhere. How EDGEBIC separates per-machine display settings from site-wide scheduling policy.

August 8, 20267 min read
Worked Examples
Worked Examples

Shipping a Step Out to a Plating Vendor and Back: A Transit Days Walkthrough

An outside operation scheduling walkthrough in EDGEBIC: model a plating vendor's turnaround with transit days, pick calendar or working days, and watch the job's finish date move.

August 8, 20269 min read
Visual Scheduling
Visual Scheduling

Showing Live Progress on Routing Diagram Nodes in EDGEBIC

Turn a routing diagram into a status board: how Node Display Fields put planned hours, actual hours, and dates under each node of a scheduled job.

August 8, 20267 min read
Visual Scheduling
Visual Scheduling

The Status Strip and the Legend on the EDGEBIC Gantt

Two small parts of a production Gantt do the heaviest reading work: the per-bar status strip and the legend generated from your own state configuration.

August 8, 20267 min read
Troubleshooting
Troubleshooting

Two Jobs Landed on the Same One-Per-Day Machine: Causes and Fixes

When a one-job-per-day machine unit shows two jobs on the same date, the cause is a stale allocation, a synchronized mirror, or too few units. How to tell which and fix it.

August 8, 20266 min read
Visual Scheduling
Visual Scheduling

What Decides Which Operations Appear on the EDGEBIC Gantt

The schedule board is a filtered picture, not the whole database. The five gates that decide whether an operation draws a bar, in the order worth checking them.

August 8, 20268 min read