Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Outcomes & ROI
Outcomes & ROI

How Routing Cleanup Buys Back Hours You Already Paid For

Most shops carry recoverable hours inside their own routings. See how a ranked suggestions report finds them, what each rule means, and what it will not do.

August 9, 20268 min read
Outcomes & ROI
Outcomes & ROI

How Sub-Assembly Visibility Ends the Late-Component Surprise

The parent job looks small because the work lives one level down. See how exploding sub-assemblies into one plan removes the feeder scramble, with numbers.

August 9, 20267 min read
Outcomes & ROI
Outcomes & ROI

How the Production Record Shortens a Quality Investigation

A quality investigation is mostly reconstruction. See how machine, operator, shift, and scrap records narrow containment fast, with the arithmetic.

August 9, 20268 min read
EDGEBIC How-To
EDGEBIC How-To

How to Assign a Unit of Measure to an Existing Product in EDGEBIC

Assign a unit of measure to an existing product in EDGEBIC so grids, reports, and shop floor screens show the right symbol instead of a blank unit column.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Batch Your Gantt Edits Before Saving in EDGEBIC

Set the scheduler update mode in EDGEBIC so Gantt drags accumulate as pending changes and commit together on Save Changes, with an out-of-sequence warning after the save.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Choose the Pieces Per Hour Rate for Actuals in EDGEBIC

Pick which pieces per hour rate EDGEBIC uses to derive hours from pieces when logging actuals, apply an observed daily rate, or revert to the routing default.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Clear Actuals for a Work Center From a Date Forward in EDGEBIC

Use the EDGEBIC Gantt right-click menu to clear actual start and end dates from a point in time across every job on one work center, then reschedule the remaining work.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Color a Routing Node in the Designer in EDGEBIC

Color a routing node in the EDGEBIC designer using the properties panel fill, border, and text colors, and keep node styling separate from work center Gantt colors.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Compare Quoted Hours Against Actual Hours in EDGEBIC

Use the Lifetime Accuracy panel on a converted EDGEBIC quote to compare the hours you estimated at quote time against the hours the job actually consumed.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Convert Several Quotes to Orders at Once in EDGEBIC

Select accepted quotes in EDGEBIC and use Convert Selected to Orders to create one manufacturing order per eligible quote, then schedule the new jobs in a single run.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Customize the Dashboard KPI Tiles in EDGEBIC

Use Dashboard Configuration in EDGEBIC to choose which KPI tiles appear, tune the green and red thresholds, set tile colors, and set an auto-refresh interval.

August 9, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Deactivate a Product Category in EDGEBIC

Deactivate a product category in EDGEBIC to retire it from the picker without losing history, and clean up the products still carrying the retired grouping.

August 9, 20266 min read
Let's Solve Your Challenges Together