Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
What Is Work Center Efficiency in Scheduling?
Work center efficiency is the percentage of nominal capacity a machine actually delivers. Learn what it means, where EDGEBIC lets you express it, and how it differs from utilization.
What Makes a Promise Date Credible in EDGEBIC
A credible promise date is one the shop can keep. See how EDGEBIC builds a quote date from real load, real work hours, and the finish-by direction that answers the customer.
Why a Visual Routing Beats a Spreadsheet BOM
A visual routing shows dependencies, branches, and dead-ends that a spreadsheet BOM hides. See why EDGEBIC draws the factory as a flow chart planners can read.
Why Actuals Are Immutable in EDGEBIC (and Why That Protects You)
Once an operation is finished, its actual dates and hours are permanent. Learn why EDGEBIC never moves completed work on a reschedule and what that guarantees.
Why One Clean Operation Record Matters in EDGEBIC
One clean record per operation keeps reschedules honest and reports accurate. Learn how EDGEBIC guards against inverted dates, orphans, and duplicate rows.
Why Quote Against Real Capacity in EDGEBIC (Not a Lead-Time Rule of Thumb)
A quote priced against your real shop load beats a fixed lead-time rule. See how EDGEBIC simulates a promise date that already accounts for every job on the floor.
Why the EDGEBIC Kiosk Has No Login (and Why That Is Deliberate)
The shop-floor kiosk uses a free-text operator name, not a login or badge scan. Learn why EDGEBIC trusts the floor and where operator identity actually matters.
Why the EDGEBIC Optimizer Is a Sidecar, Not a Replacement
The EDGEBIC optimizer sits beside the scheduling engine, never inside it, touching the engine through one seam. Here is why that architecture makes optimization safe to try.
Working Day vs Calendar Day in Production Scheduling
Working days skip weekends and closures; calendar days count every date. Learn how the working day vs calendar day choice changes transit and lead-time math on a schedule.
Batch Size vs Flow Time: The Transfer Batch Trade-Off
Batch size vs flow time: a smaller transfer batch lets the next operation start sooner and shrinks makespan, at the cost of more handoffs, with worked lot-streaming numbers.
Dedicated Cells vs Shared Work Centers
Dedicated cells vs shared work centers: a cell cuts queue and transit for one product family, a shared functional layout raises utilization but adds contention, with numbers.
Aerospace Multi-Level Assemblies: Scheduling Sub-Assemblies That Feed the Line
Aerospace multi-level assembly scheduling rolls sub-assembly hours and dependencies up through the routing, so a top-level job waits for the slowest feeder, not a guess.