Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Work Center Efficiency in Scheduling?

Work center efficiency is the percentage of nominal capacity a machine actually delivers. Learn what it means, where EDGEBIC lets you express it, and how it differs from utilization.

July 31, 20265 min read
Quoting & Promising
Quoting & Promising

What Makes a Promise Date Credible in EDGEBIC

A credible promise date is one the shop can keep. See how EDGEBIC builds a quote date from real load, real work hours, and the finish-by direction that answers the customer.

July 31, 20268 min read
Visual Scheduling
Visual Scheduling

Why a Visual Routing Beats a Spreadsheet BOM

A visual routing shows dependencies, branches, and dead-ends that a spreadsheet BOM hides. See why EDGEBIC draws the factory as a flow chart planners can read.

July 31, 202610 min read
Shop Floor Execution
Shop Floor Execution

Why Actuals Are Immutable in EDGEBIC (and Why That Protects You)

Once an operation is finished, its actual dates and hours are permanent. Learn why EDGEBIC never moves completed work on a reschedule and what that guarantees.

July 31, 20269 min read
Shop Floor Execution
Shop Floor Execution

Why One Clean Operation Record Matters in EDGEBIC

One clean record per operation keeps reschedules honest and reports accurate. Learn how EDGEBIC guards against inverted dates, orphans, and duplicate rows.

July 31, 20269 min read
Quoting & Promising
Quoting & Promising

Why Quote Against Real Capacity in EDGEBIC (Not a Lead-Time Rule of Thumb)

A quote priced against your real shop load beats a fixed lead-time rule. See how EDGEBIC simulates a promise date that already accounts for every job on the floor.

July 31, 20268 min read
Shop Floor Execution
Shop Floor Execution

Why the EDGEBIC Kiosk Has No Login (and Why That Is Deliberate)

The shop-floor kiosk uses a free-text operator name, not a login or badge scan. Learn why EDGEBIC trusts the floor and where operator identity actually matters.

July 31, 20268 min read
Schedule Optimization
Schedule Optimization

Why the EDGEBIC Optimizer Is a Sidecar, Not a Replacement

The EDGEBIC optimizer sits beside the scheduling engine, never inside it, touching the engine through one seam. Here is why that architecture makes optimization safe to try.

July 31, 20269 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

Working Day vs Calendar Day in Production Scheduling

Working days skip weekends and closures; calendar days count every date. Learn how the working day vs calendar day choice changes transit and lead-time math on a schedule.

July 31, 20265 min read
Scheduling Concepts
Scheduling Concepts

Batch Size vs Flow Time: The Transfer Batch Trade-Off

Batch size vs flow time: a smaller transfer batch lets the next operation start sooner and shrinks makespan, at the cost of more handoffs, with worked lot-streaming numbers.

July 30, 20268 min read
Scheduling Concepts
Scheduling Concepts

Dedicated Cells vs Shared Work Centers

Dedicated cells vs shared work centers: a cell cuts queue and transit for one product family, a shared functional layout raises utilization but adds contention, with numbers.

July 30, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Aerospace Multi-Level Assemblies: Scheduling Sub-Assemblies That Feed the Line

Aerospace multi-level assembly scheduling rolls sub-assembly hours and dependencies up through the routing, so a top-level job waits for the slowest feeder, not a guess.

July 30, 20269 min read
Let's Solve Your Challenges Together