Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Shift Time in Production Scheduling?

Shift time is a single day's working slot inside a shift, a start, an end, and a break, that the scheduler decodes into the productive hours a work center has that day.

August 1, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is Teardown Time in a Routing?

Teardown time is the cleanup and dismantling time at the end of a routing step, counted in a job's total-time and cost estimate but not in capacity allocation.

August 1, 20265 min read
Inventory & Planning
Inventory & Planning

When to Net Demand Against Stock vs Build Fresh in EDGEBIC

Should an order consume stock or build new units? Here are the exact gates EDGEBIC checks, the product settings that drive them, and how to decide per product.

August 1, 20269 min read
Inventory & Planning
Inventory & Planning

Why a Committed MPS Quantity Is Not Yet Supply in EDGEBIC

EDGEBIC keeps the committed MPS build quantity out of the projected balance until you firm it. Here is why that separation prevents phantom supply and double-counting.

August 1, 20268 min read
Scheduling Concepts
Scheduling Concepts

Why a Good Schedule Is Boring

A good production schedule is boring on purpose: predictable, stable, and quiet. Here is why low drama beats constant reshuffling, with the mechanisms that keep it calm.

August 1, 20267 min read
Inventory & Planning
Inventory & Planning

Why Inventory Transactions Are Append-Only in EDGEBIC

EDGEBIC never edits or deletes a stock entry. Here is why corrections happen through reversals, what that buys an auditor, and how a canceled order unwinds cleanly.

August 1, 20268 min read
Inventory & Planning
Inventory & Planning

Why On-Hand Is a Cache, Not the Source of Truth in EDGEBIC

The on-hand number you see is a fast cache over an append-only ledger. Here is why the ledger sum is authoritative, how drift is caught, and how to reconcile it.

August 1, 20268 min read
Inventory & Planning
Inventory & Planning

Why Only Confirmed Sales Orders Count as Firm Demand in EDGEBIC

EDGEBIC treats a sales order as firm demand only when its status is Confirmed. Here is why the status gate matters, how open quantity is bucketed, and the traps to avoid.

August 1, 20268 min read
Scheduling Concepts
Scheduling Concepts

Why Queue Time Is Not Wasted Time

Planned queue time in a routing is a protective buffer, not waste. Here is how a shift-aware queue absorbs variation, and how it differs from the WIP queue you want to cut.

August 1, 20268 min read
Shop Floor Execution
Shop Floor Execution

Closing the Loop from Shop Floor to Plan in EDGEBIC

A schedule is only alive if reality flows back into it. Trace the full loop in EDGEBIC: operator punch, daily actuals, reschedule, and a fresh dispatch list.

July 31, 20269 min read
Quoting & Promising
Quoting & Promising

Comparing Routing Options for a Quote in EDGEBIC

Build named scenarios to compare routing options for a quote in EDGEBIC: second shift, outside vendor, weekend push. Line up lead time and cost, then pick with numbers.

July 31, 20268 min read
Schedule Optimization
Schedule Optimization

Determinism and Reproducibility in Schedule Optimization

The EDGEBIC optimizer is deterministic: the same inputs and the same seed produce the identical plan every time. Here is why that matters for trust, audits, and support cases.

July 31, 20268 min read
Let's Solve Your Challenges Together