Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Admin & Deployment
Admin & Deployment

Planning a Multi-User EDGEBIC Rollout

Planning a multi-user EDGEBIC rollout: the sequence from a single-planner start to a shared server, what moves and what does not, and the order that avoids rework.

August 2, 20268 min read
Inventory & Planning
Inventory & Planning

Planning Inventory for a Seasonal Demand Curve

Planning inventory for a seasonal demand curve: shaping the forecast to the peak, building ahead of it, and reading the projection so the buffer holds through the season.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Protective vs Productive Capacity

Productive capacity makes throughput; protective capacity is deliberate spare on non-bottlenecks that lets the shop recover and keep the constraint fed. See why both matter, with numbers.

August 2, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

QuickBooks to EDGEBIC: The Data Mapping Reference

QuickBooks data export scheduling field by field: map items and open orders into EDGEBIC masks, build the routing model once, with conversions and upsert rules.

August 2, 202610 min read
Worked Examples
Worked Examples

Quoting Three Routing Options for a Customer in EDGEBIC

A quote simulation walkthrough: run three routing options for one order, compare promise date, cost, and margin, and give the customer a real choice.

August 2, 202611 min read
Inventory & Planning
Inventory & Planning

Reading Days of Cover in Production Planning

Reading days of cover in production planning: what the metric measures, how it differs from a projected balance, and when it is a useful gut check versus a precise read.

August 2, 20268 min read
Inventory & Planning
Inventory & Planning

Reading History Buckets: Actuals Versus Plan in EDGEBIC

How EDGEBIC splits the inventory calendar at today: history buckets show only what actually happened, future buckets show the plan. Learn to read both and compare plan to reality.

August 2, 20267 min read
Inventory & Planning
Inventory & Planning

Reading the Inventory KPI Strip in EDGEBIC

The four headline metrics above the EDGEBIC inventory calendar, current on-hand, days of cover, projected stockout, and below-safety, give a part's health at a glance. Learn to read them.

August 2, 20267 min read
Schedule Optimization
Schedule Optimization

Reading the Optimizer Move List

The optimizer move list shows one row per changed operation, with old and new start, the shift in hours, and a reason chip. Here is how to read every column and act on it.

August 2, 20267 min read
Shop Floor Execution
Shop Floor Execution

Reassigning an Operator With a Replacement Drag in EDGEBIC

On the Operator-view Gantt, dragging a bar between lanes reassigns the operation to another qualified person. Learn what the drag checks and what it deliberately does not.

August 2, 20267 min read
Scheduling Concepts
Scheduling Concepts

Released vs Unreleased Jobs in Scheduling

A released job is authorized and ready to hit the floor; an unreleased job is planned but held back. See the difference, why it controls work-in-process, and how to manage it.

August 2, 20268 min read
Inventory & Planning
Inventory & Planning

Reorder Point and Safety Stock: Two Lines, Two Jobs in EDGEBIC

In EDGEBIC a reorder point and safety stock are separate levels with different jobs. Learn why the reorder point sits above safety, and how the gap between them covers lead time.

August 2, 20267 min read
Let's Solve Your Challenges Together