- Reading the Optimizer Move List
The optimizer move list is the changes-only view of a proposal: one row per operation that actually moved, showing the kind of change, the old and new start, the shift in hours, and a plain reason chip. Operations that did not move are never listed. This makes reviewing a proposal fast and honest at the same time: you see exactly what the optimizer would change if you Accept, and the absence of a row is itself confirmation that an operation stayed put. Combined with the key performance indicator table, the move list lets you judge a proposal on both its outcome and its specific disruptions before committing to anything.
EDGEBIC by User Solutions builds this list once per run and shows it in the Optimizer tab alongside the verdict and the KPI deltas. This post walks through every column and change kind so you can read a proposal with confidence. For the numbers that sit beside the move list, see how the optimizer scores a schedule, and for what Accept does with the moves, what happens when you accept an optimized schedule.
What a move row contains
Each row describes one changed operation. The columns are:
| Column | What it tells you |
|---|---|
| Kind | The type of change: time shift, work center change, added, or removed |
| Old start | Where the operation sits in your current plan |
| New start | Where the proposal would put it |
| Start delta | The shift in hours, positive later or negative earlier |
| Reason | A plain chip summarizing the move, such as starts 4.0h earlier |
Reading left to right, a row tells a complete little story: this operation, currently here, would move to there, that many hours in that direction, for this plainly stated reason. You do not need to cross-reference anything to understand a single move.
The four kinds of change
The kind label tells you at a glance what sort of move you are looking at.
A time shift is the most common. The same operation, on the same work center, moves to a different start. On a reordering run this is the bulk of the list, because the optimizer's main lever is the order jobs are taken, and reordering shifts start times.
A work center change means an operation moved to a different machine. This appears when a step has alternate work centers available or when the reorder freed a better machine for it. Read these with a little more attention, since they change where work runs, not just when.
Added means the proposal contains an operation the baseline did not, and removed means the baseline had one the proposal drops. These are less common on a straightforward reorder and worth a look when they appear.
Why unchanged operations are hidden
A proposal on a plan with hundreds of operations may leave most of them exactly where they were. Listing every unchanged row would bury the few that matter under a wall of noise. So the move list shows only the differences, which is what makes review quick: read the handful of changes, confirm each makes sense, and decide.
The hiding also serves a quiet safety purpose. Because completed and unchanged operations do not appear, the move list doubles as confirmation that nothing you did not expect to move has moved. If your in-progress morning work is not in the list, it did not change, which it never would, since completed and started work is preserved. A short move list on a big plan is a normal, healthy result.
Reading the list against the KPI table
The move list answers "what changed," and the KPI table answers "was it worth it." Read them together. A dozen time shifts that drop weighted tardiness to zero and add two on-time jobs is a clear win: small disruption, large delivery gain. A dozen moves that barely change the numbers is a proposal you can Discard without cost. The move list lets you weigh the specific disruptions against the measured improvement, which is the judgment Accept asks you to make. Each Change cell in that table spells its direction out in a word as well as an arrow, for the reason set out in why optimizer changes show an arrow and a word.
The reason chips help here too. A row reading starts 4.0h earlier next to a job you know was at risk tells you immediately why the plan improved. The chips are templated summaries, not free text, so they read consistently across every run.
Acting on what you see
Once you have read the list, you have three honest choices. Accept persists the whole proposal through the standard pipeline, moves included, and writes an audit record. Discard drops the proposal and leaves your plan byte-identical. Or, if the numbers are good but one specific move bothers you, note it, Discard, adjust the relevant job or work center, and rerun. Nothing in the move list is applied piecemeal: a proposal is Accepted or Discarded as a whole, which keeps the never-worse guarantee intact across the plan. For that guarantee, see what the never-worse guarantee means.
The bottom line
The move list shows one row per changed operation, with its kind, old and new start, the shift in hours, and a plain reason chip, and it hides everything that did not move. That focus makes review fast and confirms at a glance that unchanged and completed work stayed put. Read the moves against the KPI table to weigh disruption against improvement, then Accept the whole proposal or Discard it at no cost. To see it, run the optimizer on the Optimizer tab in Schedule Jobs and open the changes list beneath the verdict. For the wider picture, read the EDGEBIC optimizer guide, and explore the platform at EDGEBIC.
Expert Q&A: Deep Dive
Q: The move list shows 12 rows but I have 200 operations. Did the optimizer only look at 12?
A: No, it evaluated complete schedules for all 200 operations. The move list shows only the 12 that changed between your current plan and the proposal. The other 188 are unchanged and are deliberately not listed. Twelve moves producing a real improvement is a common and healthy result: the optimizer found a small set of reorderings that helped, and left everything else alone.
Q: A row says work center change. Should I be cautious about that?
A: Read it, but it is a legitimate move when a step has alternate work centers or the reorder freed a better machine. A work center change row shows the operation moving from one machine to another. Confirm the new machine is one you are comfortable running that operation on, then judge it against the key performance indicator improvement the whole proposal delivers. If it bothers you, Discard costs nothing and leaves your plan untouched.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
The Nearest Challenger Line in an Optimizer Result
When the optimizer says your plan is still the best, it often names the runner-up and how far behind it was. That one line tells you how close the decision was and whether to look again.
What Happens When the CP-SAT Solver Is Not Installed
You selected the mathematical solver in Options but the badge still says best of N tried. That is a deliberate fallback, not a fault, and here is how to confirm it and what you keep.
What the Optimizer Needs Before Its First Run
Four prerequisites, only one of which is mandatory. Here is the short checklist before your first optimizer run, and the two messages that tell you a prerequisite is missing.