Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Visual Scheduling
Visual Scheduling

Staging Schedule Changes: Save and Discard on the EDGEBIC Gantt

Staging schedule changes before saving keeps EDGEBIC edits safe: dragged bars go pending, nothing hits the database until Save Changes, and Discard reverts them all.

August 3, 20268 min read
Visual Scheduling
Visual Scheduling

The Gantt Right-Click Menu: Every Operation Action in EDGEBIC

The EDGEBIC Gantt right-click menu puts exact moves, actuals logging, locking, and cleanup on one operation bar, so you can act precisely instead of dragging by eye.

August 3, 20268 min read
Visual Scheduling
Visual Scheduling

The Job View Cockpit: One Job in Full Depth in EDGEBIC

The Job View tab in EDGEBIC is a single-job cockpit: a summary panel, an hours roll-up of total, actual, remaining, and percent complete, a per-operation grid, and its own Gantt strip.

August 3, 20268 min read
Visual Scheduling
Visual Scheduling

The Lead-Time Tail: the EDGEBIC Gantt Bar You Cannot Drag

The lead-time tail on the EDGEBIC Gantt is a display-only bar between a job's last operation and its final availability date, so promised dates stay honest and it consumes no capacity.

August 3, 20267 min read
Upgrade & Comparison
Upgrade & Comparison

The Order to Import Your Data Into EDGEBIC

Import your data into EDGEBIC in dependency order: products and work centers first, then routings, then orders. References link by name, so the thing pointed at must exist before the pointer.

August 3, 20267 min read
Upgrade & Comparison
Upgrade & Comparison

Validating a Migrated Schedule Against RMDB

Validate a migrated schedule by comparing EDGEBIC's dates against RMDB job by job. Verify capacity first, then treat every difference as a modeling detail to reconcile, not a failure.

August 3, 20268 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Planned Order Receipt?

A planned order receipt is a system-suggested future supply in a bucket, not yet firmed into a real order. Here is the MRP term explained and how a planner acts on it.

August 3, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Planning Bucket in MRP?

A planning bucket is a fixed time period, day, week, or custom period, used to group demand and supply when projecting inventory forward. Here is the term explained.

August 3, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Punch Source in Shop Floor Tracking?

A punch source records who or what created a production punch: operator, supervisor, an import, or the system. Here is the term explained with its four values.

August 3, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Requirement Type in a Routing Step?

A requirement type sets whether a routing step is measured in hours, pieces, or both, with the binding limit constraining the schedule. Here is the term explained.

August 3, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Schedule Operator Assignment?

A schedule operator assignment records the engine's operator booking for one scheduled operation. Here is the term explained and why it is a plan, not a payroll record.

August 3, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Scheduled Receipt in MRP?

A scheduled receipt is an already-confirmed future supply, such as an open work order or purchase order. Here is the term explained and how a planner nets against it.

August 3, 20266 min read
Let's Solve Your Challenges Together