Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
Running a Weekend on a Capacity Override to Hit a Due Date in EDGEBIC
Recover a job that would finish late over a closed weekend by adding a Saturday capacity override, and watch EDGEBIC create a synthetic override-day slot and place the work there.
Running the Optimizer End to End in EDGEBIC: Baseline, Optimize, Compare, Accept
Follow a three-job schedule through the EDGEBIC optimizer: read the greedy baseline, pick a goal, run, compare KPI deltas and moves, and Accept, with honest badges explained.
Scheduling a Nightly ERP Export and Import Routine for EDGEBIC
How to run a repeatable nightly or weekly ERP export and EDGEBIC import routine: mask order, safe re-imports, verifying counts, and keeping the schedule current.
Scheduling a Skill-Gated Job With a Certified Operator in EDGEBIC
Certify one welder for a skill, gate two jobs on it, and watch EDGEBIC slide the second job to the next day because one person cannot weld two machines at once, with the ledger shown.
Scheduling When Your ERP Has No Routing Data
How to schedule at finite capacity when your ERP only carries items and orders: build routings once inside EDGEBIC, import demand from the ERP, and keep both in sync.
Setting Up a Work Center Group and Watching It Load-Balance in EDGEBIC
Build a MILLING work center group of three interchangeable machines, route steps to the pool, and watch EDGEBIC shop the group by capacity, with the factor math shown.
Switching the EDGEBIC Datasource
How to switch EDGEBIC between a local database and SQL Server from the DataSource tab: back up first, test the connection, and understand what does and does not move.
The EDGEBIC Data Clear Tool and When to Use It
The EDGEBIC Clear Data Tables utility wipes jobs or a whole database with no undo. Here are its guards, the right times to use it, and the backup habit that protects you.
The EDGEBIC Schedule Change Log and Audit Trail
How EDGEBIC records schedule changes and security events: the change log written on every accepted reschedule, the append-only audit trail, and what an admin can answer with them.
Troubleshooting EDGEBIC Database Connections
When EDGEBIC will not connect to its database: the recovery window, the four fix actions, and the common causes for local and SQL Server setups.
Upgrading EDGEBIC Safely
How to upgrade scheduling software without losing data: back up first, let the database update itself on first launch, and verify before the team logs in.
What Is a BOR Annotation in Routing? EDGEBIC Definition
A BOR annotation is a free-text sticky note attached to a step in the graphical routing designer. See how EDGEBIC lets planners leave shop-floor context on a routing without changing its logic.