Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
What Is a Security Role in Manufacturing Software? EDGEBIC Definition
A role is a named bundle of permissions assigned to users. See how EDGEBIC unions roles, why rights are additive only, and what happens to roles after an upgrade.
What Is a Short-Confirm Flag on a Routing Step?
A short-confirm flag is a per-step opt-in that forces unlogged hours to be rescheduled when a job is closed short. Learn how it works with site confirm policy.
What Is a Stale Capacity Reservation in Scheduling?
A stale capacity reservation is a machine booking left by an earlier run for work that never started. Learn why a reschedule must release it before re-planning.
What Is a Synthetic Shift Slot in Capacity Scheduling?
A synthetic shift slot is the placeholder shift the scheduler creates when a capacity override lands on a day with no regular shift. Learn how weekend overrides work.
What Is Actual Cost in Earned Value Reporting? EDGEBIC Definition
Actual cost is the hours truly logged against a job by the cut-off date. See how EDGEBIC measures it in hours first, values it in currency second, and uses it for CPI.
What Is an Inferred Completion in Rescheduling?
An inferred completion is a step the scheduler concludes must have run because a later step was logged. Learn how backfilled actuals keep a reschedule honest.
What Is Days Late on a Job? EDGEBIC Definition and Formula
Days late is the gap between a job's last scheduled operation end and its due date. See the formula, why only positive values appear, and how the signed version differs.
What Is Estimated Lead Time on a Quote? EDGEBIC Definition
Estimated lead time is the calendar gap between a quote simulation's start and end. See why it dwarfs the work hours and how it differs from a product's lead time.
What Is Moving Average Cost? EDGEBIC Inventory Definition
Moving average cost is one blended unit cost recomputed on every receipt. See the weighted-average formula, why issues never change it, and how it is stamped on the ledger.
What Is OTIF in Production Scheduling? EDGEBIC Definition
OTIF is on-time in full delivery performance. See how EDGEBIC computes the executive tile over a 90 day window, why it reads Plan, and what it does not measure.
What Is Per-Instance Capacity in Scheduling?
Per-instance capacity is one machine's share of a work center's shift hours. Learn how the scheduler uses it to decide whether a machine can take another job.
What Is Planned Value? EDGEBIC Definition and Formula
Planned value is the hours a job was scheduled to have finished by the report cut-off. See the clipping formula, a worked example, and how EDGEBIC computes it.