Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Troubleshooting
Troubleshooting

A Work Center Group Scheduled the Wrong Machine: Causes and Fixes

When a machine-pool routing lands on a machine you did not expect, the cause is usually the group's selection strategy working as designed. How to read the choice and steer it.

July 27, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Add a Machine to a Pool in EDGEBIC

Add a member to a work center group in EDGEBIC so every routing bound to the pool considers it. Set the member's efficiency factor, setup override, and priority.

July 27, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Add a Product to the MPS Grid in EDGEBIC

Get a product onto the MPS grid in EDGEBIC: set build method to make-to-stock, flag it stocked, then open the master production schedule tab and select it.

July 27, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Add a User in EDGEBIC

Add a named sign-in account in EDGEBIC: open Security, click New user, fill the dialog, tick a role, and set the must-change flag so the person picks their own password.

July 27, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Add an Extra Shift in a Scenario in EDGEBIC

Model a second shift or overtime in an EDGEBIC scenario: add a work center capacity override, set the capacity percent, and re-simulate the what-if.

July 27, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Add Transit Days Between Two Steps in EDGEBIC

Add a shipping or outside-vendor delay between two routing steps in EDGEBIC. Set transit days on the upstream step and choose calendar or working days.

July 27, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Audit the Inventory Ledger for a Part in EDGEBIC

Audit the inventory ledger for a part in EDGEBIC: open Transaction History, read the running balance, filter to manual movements, and confirm on-hand matches the ledger.

July 27, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Back Up the EDGEBIC Database

Back up the EDGEBIC database: click Export on the DataSource tab for a timestamped SQLite copy, or use your SQL Server backup plan. One click before every destructive change.

July 27, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Certify an Operator With an Expiry Date in EDGEBIC

Record an operator certification with an expiry date in EDGEBIC so the scheduler stops counting the person as qualified once the credential lapses.

July 27, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Change the Drag Mode on the Gantt in EDGEBIC

Change the drag mode on the EDGEBIC Gantt: pick what a drag records with the Drag writes selector (Actual Start & End, Actual Start, or Planned Start) before you move a bar.

July 27, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Change the Gantt Color Coding in EDGEBIC

Change the Gantt color coding in EDGEBIC: recolor or switch off any operation state in the scheduler configuration, apply it, and match the legend to your plant.

July 27, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Change the MPS Bucket Size in EDGEBIC

Change the MPS bucket size in EDGEBIC between day, week, and period on the grid, and understand why switching does not re-bucket committed quantities.

July 27, 20266 min read