EDGEBIC How-To

How to Change the Gantt Color Coding in EDGEBIC

User Solutions TeamUser Solutions Team
|
7 min read

To change the Gantt color coding in EDGEBIC, open the Schedule View, go to the Configuration tab, and edit the Detail Schedule Operation States list on the General tab: each state has a color swatch and an active checkbox, and Save and Apply Now Configuration repaints both the bars and the legend. The colors are a display setting in EDGEBIC by User Solutions, not a scheduling rule, so recoloring a bar changes what you see and nothing about what the engine computed.

This post covers the one task. To learn what each color actually means before you change it, read Gantt colors and labels in EDGEBIC; the full task library sits at the EDGEBIC how-to hub.

Before You Start

  • You can reach the Schedule area and its Schedule View sub-tab.
  • You understand that display settings are per user and per machine, not shared across the plant.
  • You know which operation state you want to recolor. The states are Default, Overridden, Applied, Resource Replaced, Rescheduled, Actual Start Applied, Downstream Changed, ERP Actuals, Planned Applied, and the Completed shade.

The Steps

  1. Open the Schedule area and select the Schedule View sub-tab.
  2. Click the Configuration tab (the gear icon beside the scheduler view). It opens on the General tab.
  3. Find the Detail Schedule Operation States list. Each row is one operation state with a color swatch and an active checkbox.
  4. Click the swatch for the state you want to recolor and pick a new color.
  5. Untick the active box on any state you never want drawn. That state stops coloring bars and disappears from the legend.
  6. Click Save and Apply Now Configuration at the bottom of the tab. The Gantt and the legend both repaint immediately.

If you want to move this palette to another machine, use Export to write the configuration to a file, then Import it on the target machine. Reset to Defaults returns every swatch to the factory colors.

What Changes When You Save

SurfaceEffect
Gantt barsEvery bar in the changed state repaints to the new color at once.
The legendThe legend strip mirrors the same swatch, so bar and legend stay in sync.
A switched-off stateBars in that state fall back to their neutral drawing and the state leaves the legend.
The planNothing. Colors are presentation only; no schedule date, work center, or hour moves.
Other usersNothing, unless they Import your exported configuration.

The one visual treatment that is not a plain color is the Completed shade. It paints an opaque fill over whatever state color a finished bar carried, so a completed operation reads as complete no matter what state it was in. That shade still has its own color and active flag in the same list, so you tune it exactly like the others.

How to Check It Worked

Drag any bar into the state you edited, or pick a job that already sits there, and confirm the bar and the matching legend entry both show the new color. If a state you switched off still colors bars, you likely edited the swatch but left the active box ticked, or you did not press Save and Apply Now Configuration. Reopen the Configuration tab and confirm both.

Common Mistakes

Editing the color but forgetting to apply. The Configuration tab stages your change; it does not take hold until you click Save and Apply Now Configuration. If the Gantt looks unchanged, that is almost always why.

Recoloring the actual-versus-planned overlay here. The overlay markers (actual start, actual end, early and late variance, in-progress) have their own colors on the Manufacturing tab, not in the operation-states list. If it is the overlay you want to restyle, see how to show actual versus planned on the Gantt in EDGEBIC.

Assuming everyone sees your colors. The display configuration is per user and per machine. A colleague on another station keeps their own palette until they Import yours.

Switching off ERP Actuals to hide a bar you dislike. ERP Actuals outranks every other state on purpose, because it marks dates fed from an external system. Turning off its color does not change the underlying data; if the data is wrong, fix it at the source, not on the Gantt.

What to Do Next

Colors answer "what state is this bar in." The text on the bar answers "which job and operation is this," and you tune that separately: how to change what a Gantt bar label shows in EDGEBIC walks through the label pattern. For the wider set of display switches on this screen, EDGEBIC configuration options explained is the overview, and the EDGEBIC product page gives the whole picture of the scheduler these bars come from.

Expert Q&A: Deep Dive

Q: New planners keep confusing Applied and Rescheduled bars. Can I make them obviously different?

A: Yes, and it is a five-minute fix. Open the Configuration tab, find the Applied and Rescheduled rows in the Detail Schedule Operation States list, and give them two colors that are hard to mistake for each other, for example a strong green for Applied (you moved it) and a cool blue for Rescheduled (actuals match the plan). Click Save and Apply Now Configuration and the legend updates with the same swatches, so the new planners can map bar to legend at a glance. Because the palette is per user, you can set this on the training station without touching anyone else's screen.

Q: After an update I have three new bar states I did not configure. Where did they come from and do I have to reset?

A: You do not have to reset. When new operation states ship (recent examples are Planned Applied and the Completed shade), EDGEBIC appends them to your saved configuration automatically instead of overwriting your existing colors, so you keep every swatch you already tuned and simply gain the new rows with default colors. Open the Detail Schedule Operation States list, recolor the three new rows to taste or untick the ones you do not use, and Save and Apply Now Configuration. Nothing you set before the update is lost.

Frequently Asked Questions

Ready to Transform Your Production Scheduling?

User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team

User Solutions Team

Manufacturing Software Experts

User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.

Let's Solve Your Challenges Together