Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

EDGEBIC How-To
EDGEBIC How-To

How to Connect EDGEBIC to SQL Server

Connect EDGEBIC to a SQL Server database: enter the server and database, choose Windows or SQL authentication, test the connection, then apply and restart.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Count Only Primary Hours in Job Totals in EDGEBIC

Stop synchronized parallel machines from double counting: turn on Primary hours only in EDGEBIC so job and routing totals reflect the primary path.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Deactivate a Work Center in EDGEBIC

How to retire a machine from scheduling in EDGEBIC by deactivating the work center, why it beats deleting, and the routing references to clear first.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Handle a Shift Handoff on the Kiosk in EDGEBIC

Handle a shift handoff on the EDGEBIC kiosk: open the Shift Handoff summary to see Setup, Run, and Down hours, piece totals, and the recent pauses the next shift inherits.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Keep Today's Schedule From Changing in EDGEBIC

Keep today's plan stable in EDGEBIC when you reschedule: leave near-term jobs unselected, log actuals to lock started work, and use planned-start pins to hold future positions.

July 28, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Mark a Work Center as Continuous Process in EDGEBIC

How to set the Continuous-Process flag on a work center in EDGEBIC so paint, chemical, and food lines use time-based lot streaming instead of piece-count transfer batches.

July 28, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Model a Branching Routing in EDGEBIC

Build a routing that splits into parallel paths and rejoins in EDGEBIC. Use multi-select next-in-sequence links to fork and merge steps, with every branch ending at the product.

July 28, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Move EDGEBIC to a New Computer

Move a single-user EDGEBIC install to a new PC: export the database, install on the new machine, point the connection at the copied file, and sign in.

July 28, 20268 min read
EDGEBIC How-To
EDGEBIC How-To

How to Name and Color a Work Center for the Gantt in EDGEBIC

How to set a work center's ID, name, and Gantt bar colors in EDGEBIC so the shop floor can tell machines apart at a glance on the schedule.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Protect a Due Date With a Buffer in EDGEBIC

Protect a due date in EDGEBIC with Theory of Constraints buffers: anchor the constraint so a shipping buffer sits before the ship date, plus queue time and headroom levers that add slack.

July 28, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Put a Product Image on a Routing Node in EDGEBIC

Give a product a thumbnail so its node shows the image in the EDGEBIC routing designer. Upload the picture on the product record and the graphical BOR editor renders it on the node.

July 28, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Read the Job Status Donut in EDGEBIC

Read the job status donut on the EDGEBIC capacity dashboard: what Late, Overdue, On time, and Early mean, and why a job can read late before its due date arrives.

July 28, 20266 min read
Let's Solve Your Challenges Together