To handle a shift handoff on the EDGEBIC by User Solutions kiosk, tap Handoff on the header and read the Shift Handoff summary: Setup, Run, and Down hours, good and scrap piece totals, and the recent pauses with their reason codes. It is the open issues and the productive-time picture the oncoming shift inherits, on one read-only screen. Nothing is written and nothing moves, so an operator can open it any time to check where the shift stands.
This is the handoff task specifically. The full operator workflow around it lives in the shop floor execution guide.
Before You Start
| Prerequisite | Why |
|---|---|
| The kiosk is bound to this work center | The handoff summarizes the bound machine's activity, not the whole plant |
| Operators punched their pauses with reasons through the shift | Recent Pauses is only useful if pauses were recorded with a category |
| You know your shift start, or accept the default window | The summary covers activity since the shift start |
Step 1: Open the Shift Handoff Summary
Tap Handoff on the kiosk header. The Shift Handoff summary opens. This is a read-only screen: opening it collects and displays data, it never writes any. That means the outgoing operator can open it early to preview the shift, and the oncoming operator can reopen it to confirm what they are inheriting.
Step 2: Read the Hour Buckets
The top of the summary splits the shift into three hour buckets.
| Bucket | What it counts |
|---|---|
| Setup | Time on setup punches, including the phase-by-phase changeover work |
| Run | Productive time on run punches, the only bucket that counts as production hours |
| Down | Time the machine was paused or down, carried with its reason |
Run is the productive number. Setup and Down are shown alongside it, not folded into it, so the shift's output time and its lost time are legible separately. How that hour split feeds the wider schedule is covered in actuals tracking explained.
Step 3: Read the Piece Totals
Below the hours, the summary shows the shift's good and scrap piece totals. Good pieces are the produced quantity; scrap is tracked separately, and every scrap piece carried a reason when it was recorded. The two numbers together tell the oncoming shift how far along the current job is and whether quality has been an issue.
Step 4: Read the Recent Pauses
The Recent Pauses list shows the most recent Down and Idle events with the reason code each carried, drawn from the four categories: Machine, Material, Quality, and Waiting. This is the part that carries open issues across the shift change. A coolant problem that paused the machine is on the list with its category, so the next operator inherits the problem instead of rediscovering it.
Step 5: Pass It On
Read the summary to the oncoming operator, or print it. Because the screen is a snapshot of real punches, there is no verbal step where an issue can be forgotten: if it paused the machine, it recorded a reason, and the reason is on the list.
What Changes When You Open the Handoff
Nothing in the database. The handoff is a projection over the shift's closed punches. It reassigns nothing and reschedules nothing, because the kiosk cannot edit the schedule. Any real movement of work is a planner action back in the scheduling application, informed by what the handoff shows.
How to Check It Worked
The three hour buckets sum to roughly the elapsed shift time minus any open punch, the piece totals match what the operator remembers tapping, and the Recent Pauses list names the interruptions the shift actually had. If a running job's hours look low, its current punch is still open and will roll into the totals when it closes.
Common Mistakes
- Reading Run and expecting it to equal the whole shift. Run is productive time only. Add Setup and Down for the elapsed picture.
- Expecting an open job's hours in the totals. Open punches are excluded until they close. Complete or pause the job first if you need it counted.
- Skipping pause reasons during the shift. A pause with no honest reason leaves the Recent Pauses list uninformative, which is the one thing the handoff exists to provide.
- Treating the handoff as an action screen. It reports; it does not move work. Rescheduling is a planner task.
Next Steps
To dig into any interruption on the list, open how to see a machine's job history on the kiosk. Closing out a job before the shift ends is how to complete an operation.
Every task in this library is indexed on the EDGEBIC how-to hub. To see a handoff summary build itself from live punches, book a walkthrough of EDGEBIC.
Expert Q&A: Deep Dive
Q: Our handoffs are verbal and things fall through the cracks, especially open downtime issues. How does the kiosk fix that?
A: The value is in the Recent Pauses list. Every pause on the kiosk carries a reason code from the four categories Machine, Material, Quality, and Waiting, and the handoff surfaces the most recent of those. So a coolant issue that paused the machine at 14:30 is on the screen, with its category, when the next operator walks up. That turns the handoff from memory into a record. The outgoing operator does not have to remember to mention the coolant problem, because the pause that recorded it is right there under Recent Pauses. The oncoming shift inherits the open issue instead of rediscovering it two hours in.
Q: The reported Run hours on the handoff are lower than the wall-clock time the operator was here. Is that a bug?
A: No, that is the design. Only Run time counts as production hours. Setup, Down, and Idle are recorded on their own punches and shown in their own buckets on the handoff, but they are kept out of the Run figure. So an eight-hour shift with a 40-minute coolant pause and 50 minutes of setup shows roughly 6.3 Run hours, not 8. That separation is deliberate. It means the Run number reflects actual output time, and the Setup and Down numbers point straight at where the rest of the shift went. If you want the full elapsed picture, add the three buckets together; if you want productive time, read Run alone.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.