Manufacturing Scheduling Software for the Real Shop Floor

Manufacturing scheduling software assigns every work order to a machine, a crew and a time slot within the capacity your plant really has, and re-plans when priorities, machines or materials change. EDGEBIC (RMDB 2.0) by User Solutions does it for discrete, batch and mixed-mode manufacturers, from Amish furniture makers to the world's largest aircraft carrier.

Built for schedulers and plant managers who run the week from a spreadsheet, or from an ERP that ignores capacity. One-time license from $25,000, working alongside your ERP.

Last updated

EDGEBIC job Gantt view showing scheduled production jobs across a timeline with planned dates
Job Gantt View: what ships this week, which jobs are late and which are safe

Proven across manufacturing types

Job Shops

Technical Glass Products

Defense

USS Nimitz, BAE Systems

Electronics

Enevate, Kyocera

Heavy Equipment

Cummins, GE Railcar

Consumer Goods

Sleepmaster, Plastilite

Why Manufacturing Scheduling Is So Hard

Manufacturing scheduling is not a planning exercise. It is an operational discipline that must account for machine availability, labor skills, material lead times, tooling constraints, and constantly shifting priorities. Most software treats it as the former, producing schedules that fail on the shop floor.

  • Constant priority changes from rush orders and customer reschedules
  • Machine downtime and maintenance disrupting planned schedules
  • Skilled labor shortages making machine-only scheduling useless
  • Complex routings with alternate workcenters and split operations
  • ERP systems producing schedules disconnected from shop floor reality
  • No visibility into what is actually achievable this week

RMDB, Now EDGEBIC: Built for the Manufacturing Shop Floor

RMDB, and EDGEBIC by User Solutions after it, gives manufacturers a scheduling system that matches the complexity of their operations. It handles discrete and batch manufacturing, complex routings, alternate workcenters, split operations, and multi-constraint scheduling, all while remaining flexible enough to reconfigure on-the-fly when priorities change.

  • Finite capacity scheduling across machines, labor, materials, and tooling
  • Complex routing management with alternate workcenters
  • On-the-fly schedule reconfiguration when priorities change
  • Discrete, batch, and mixed-mode manufacturing support
  • Interactive Gantt charts with drag-and-drop (in EDGEBIC)
  • Forward and reverse scheduling with priority management
  • Downtime and maintenance window scheduling
  • Sub-assembly scheduling up to 10 levels deep
  • What-if scenario analysis for new orders and capacity
  • Works standalone or as an ERP scheduling add-on
EDGEBIC planning board showing a finite capacity schedule of operations across work centers
Planning Board: every operation on every machine, rescheduled to finite capacity when you drag one

The Resource Manager-DB solution has once again exceeded our expectations regarding its adaptability. [...] The result was our substantially increasing production capacity with existing resources.

Scott McNeill, Production Scheduler, Technical Glass Products. Read the story

Manufacturing Scheduling Results

Basic weekly schedule moved from a 40-hour scheduler task to a 2-hour clerk taskHomestead Furniture
40 to 2 hrs
More business taken on with the existing workforceTechnical Glass Products
4%
Coordinated under one common computerized production scheduleKyocera Industrial Ceramics
3 depts
From start to a complete optimized schedule with ERP integrationPlastilite Corporation
1 week

EDGEBIC vs Spreadsheets, ERP Scheduling Modules and Enterprise APS

Four ways manufacturers schedule the shop floor. What decides whether a schedule survives the week is whether it knows your real capacity and can re-plan when the floor changes.

SpreadsheetERP scheduling moduleEnterprise APSEDGEBIC
Capacity modelWhatever you build by handUsually infinite capacity with fixed lead timesFinite, deep constraint modellingFinite across machines, labor, materials and tooling
When the floor changesRebuild the sheetRerun the schedule, often overnightReplansDrag an operation and everything downstream re-plans
Labor and skillsA separate rosterRarely a constraintYesOperator skills, certifications and shift rosters
Works with your ERPManual re-keyingIt is the ERPPre-built connectors to major ERPsAny ERP that exports Excel, CSV or database tables
ImplementationHoursPart of the ERP projectMonths, usually consultant-ledDays to weeks (Plastilite: 5 days with ERP integration)
PricingFreeIncluded or an add-on moduleAnnual per-seat subscription or a $50K+ project$25,000 or $35,000, one time

EDGEBIC Pricing: Published, One-Time

Two editions of EDGEBIC by User Solutions, both perpetual licenses with updates included and no per-seat annual fee. EDGEBIC is an installed Windows application, not a subscription service. See EDGEBIC pricing and editions or how this compares with the market.

EditionWhat it includesOne-time license
EDGEBIC APSFinite capacity scheduling and optimization: graphical routing designer, forward and backward scheduling, Theory of Constraints anchoring, parallel work centers, sequence-dependent setup, lot streaming, operator skills, and a two-layer schedule optimizer.$25,000
EDGEBIC CompleteEverything in EDGEBIC APS plus MRP, inventory, purchasing and material pegging, so material availability constrains the schedule alongside machines and labor.$35,000

Works Alongside Your ERP

Keep your ERP as the system of record. Orders, routings, work centers and actuals come into EDGEBIC from Excel, CSV or database tables, and finite capacity schedules and realistic dates go back out. No middleware and no custom API project. Step-by-step integration guides:

Using a different system? Any ERP that exports Excel, CSV or database tables works. See EDGEBIC ERP integration and the ERP scheduling add-on.

Frequently Asked Questions

See your own week scheduled to real capacity

Schedule a free live demo with your own manufacturing data. Bring open work orders and routings, and see a realistic schedule built in the session.

Or see RMDB features or EDGEBIC by User Solutions.

Request a free demo
Let's Solve Your Challenges Together