Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Chemical Processing: Scheduling Continuous and Batch in One Plan

Chemical processing scheduling that handles both worlds: mark reactors and lines as continuous with an hours-based overlap, and schedule discrete packaging by piece count.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

CNC Shops and Operator Skills: When the Setter Is the Constraint

CNC operator skill scheduling models the certified setter as a finite resource, so lights-out cells start on the hours one operator actually has, not machine count.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Consumer Goods: Sequencing Lines to Cut Changeover Waste

Consumer goods changeover sequencing that holds up: price each flavor and scent change per line in a matrix, then let the optimizer order the run to minimize total setup.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Consumer Goods: Scheduling Through a Seasonal Peak

Seasonal capacity scheduling for consumer goods: add a shift, raise a line's hours for a peak week, and let finite-capacity planning show whether the season actually fits.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Contract Manufacturers: One Schedule Across Many Customers

Contract manufacturer scheduling that shares machines across customers: route steps to machine pools, weight jobs by priority, and load every customer against one finite plan.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Electronics Quoting and What-If: Comparing Scenarios Before You Commit a Date

Electronics quote what-if scheduling compares scenarios like weekend shifts or extra line capacity against a real simulation, so an EMS quotes the date it can defend.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Food Manufacturing Traceability: The Production Record Behind Every Batch

Food manufacturing traceability starts with a production record: which line ran the batch, when, how many good and scrap pieces, and the exact routing used.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Foundries: Scheduling Furnace Batches and Casting Lots

Foundry lot scheduling: run a furnace as parallel chambers with one job each per day, then model the cooling delay before castings can move to machining.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Furniture Manufacturing: Pool Your Routers and Sanders Into Work Center Groups

Furniture work center group scheduling lets a routing say ANY ROUTER, so the scheduler picks the machine with real capacity on every run and idle machines stop sitting.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Long-Lead Assemblies: Scheduling Around the Casting That Takes 12 Weeks

Long lead assembly scheduling for heavy equipment: pull the build to finish just in time, reserve the delivery tail, and time the work around a casting that arrives weeks out.

July 30, 202610 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Heavy Equipment: Scheduling One Job Across Two Plants

Heavy equipment multi plant scheduling done right: model the days a weldment spends in transit between facilities so downstream steps start when the parts actually arrive.

July 30, 20269 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

High-Mix Low-Volume: Scheduling Hundreds of Small Jobs

High mix low volume scheduling that holds together: pool flexible machines, price sequence-dependent setups, and load hundreds of small jobs against one finite plan.

July 30, 202610 min read
Let's Solve Your Challenges Together