Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Visual Scheduling
Visual Scheduling

How Drag and Drop Shows the Downstream Ripple

When you drag one operation in EDGEBIC, the later steps that may now be out of sequence turn amber. See how the downstream ripple works and how to clear it.

July 31, 202610 min read
Outcomes & ROI
Outcomes & ROI

How Finite Capacity Scheduling Ends the Daily Firefight

Firefighting is the daily cost of a plan that ignores capacity. See how finite capacity scheduling surfaces conflicts early, with worked arithmetic and honest limits.

July 31, 20269 min read
Outcomes & ROI
Outcomes & ROI

How Honest Promise Dates Win Repeat Customers

The date you promise is a retention decision. See how capacity-based promise dates build repeat business, with quote-simulation arithmetic and honest limits.

July 31, 20269 min read
Outcomes & ROI
Outcomes & ROI

How One Source of Truth Ends Spreadsheet Sprawl

A dozen scheduling spreadsheets is a dozen versions of wrong. See how one computed schedule ends the sprawl, with heritage arithmetic and honest limits.

July 31, 20269 min read
Shop Floor Execution
Shop Floor Execution

How Partial Completions Carry Forward in EDGEBIC

When an operation is half done or marked complete short of plan, EDGEBIC keeps the logged hours and re-plans only the remainder. See how partial work carries forward.

July 31, 20269 min read
Shop Floor Execution
Shop Floor Execution

How Piece Counts Feed the EDGEBIC Schedule

Pieces and hours are two views of the same work. Learn how EDGEBIC converts between them with an effective rate and how good piece counts roll into the plan.

July 31, 20269 min read
Outcomes & ROI
Outcomes & ROI

How Schedule Stability Lowers Overtime

Most overtime is a reaction to a plan that keeps changing. See how a stable schedule cuts the catch-up premium, with worked arithmetic and honest limits.

July 31, 20269 min read
Outcomes & ROI
Outcomes & ROI

How Better Scheduling Frees the Cash Trapped in WIP

Work in process is cash standing on the floor. See how release-timing scheduling frees working capital, with backward-scheduling arithmetic and the honest limits.

July 31, 20269 min read
Shop Floor Execution
Shop Floor Execution

How Supervisors Use the EDGEBIC Dispatch View

The dispatch view turns the scheduler's decisions into a per-person, per-day work list a supervisor can hand out at shift start. Here is how it fits the supervisor's day.

July 31, 20269 min read
Visual Scheduling
Visual Scheduling

How the Designer Shows Sub-Assembly Branches

See how the EDGEBIC designer draws a sub-assembly branch: a star-marked node feeding a merge point, a routing that explodes at schedule time, and how to preview it.

July 31, 202610 min read
Visual Scheduling
Visual Scheduling

How the Gantt Shows a Job Spanning Shifts

See how the EDGEBIC Gantt draws an operation across shifts and days: bars follow shift calendars, skip weekends and holidays, and split work across instances.

July 31, 202610 min read
Schedule Optimization
Schedule Optimization

How the EDGEBIC Optimizer Cuts Total Setup Time

The EDGEBIC optimizer can sequence jobs to slash changeover hours the base scheduler never sees, modeling sequence-dependent setup as a solvable circuit. Here is the mechanism.

July 31, 20268 min read
Let's Solve Your Challenges Together