Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

Planning and scheduling practice that applies whichever system you run.

Manufacturing financial accounting with profit and metrics analysis on a laptop
Manufacturing KPIs

Throughput Accounting: The TOC Financial Framework That Replaces Cost Accounting

Throughput Accounting from the Theory of Constraints replaces overhead allocation with T, I, and OE - decision rules that help manufacturers schedule and prioritize for profit.

April 27, 202612 min read
Two warehouse managers reviewing logistics and inventory management for supply chain coordination
Supply Chain

Dual-Sourcing Strategy: How to Schedule Across Two Suppliers With Different Lead Times and Costs

Learn how to implement a dual-sourcing strategy in manufacturing - allocating orders between primary and secondary suppliers with different lead times, costs, and quality levels.

April 27, 202611 min read
Industrial worker inspecting materials on a factory floor as part of a quality control process
Glossary

What Is FMEA (Failure Mode and Effects Analysis)? Manufacturing Guide

FMEA (Failure Mode and Effects Analysis) is a systematic risk method that scores failure modes by severity, occurrence, and detection to prioritize corrective actions.

April 27, 20265 min read
Team members brainstorming and mapping causes on a whiteboard during a root cause analysis session
Glossary

What Is RCA (Root Cause Analysis)? Definition, Methods, and Manufacturing Examples

RCA (Root Cause Analysis) is a systematic process that identifies the fundamental cause of a problem so corrective actions prevent recurrence, not just fix symptoms.

April 27, 20265 min read
Wide-angle view of a warehouse with stacked shelves representing supply chain operations
Glossary

What Is SCM (Supply Chain Management)? Definition and Manufacturing Guide

SCM (Supply Chain Management) is the active coordination of planning, sourcing, production, delivery, and returns to maximize customer value and competitive advantage.

April 27, 20265 min read
Workers in safety gear servicing industrial machinery inside a factory
Finite Capacity Planning

OEE-Adjusted Capacity Planning: How to Model Planned and Unplanned Downtime

Most capacity plans assume machines run at 100%. OEE tells you they don't. Learn how to build realistic OEE-adjusted capacity models that account for downtime.

April 27, 202611 min read
Manufacturing planner reviewing production schedule on a digital dashboard
Manufacturing KPIs

Schedule Adherence vs. On-Time Delivery: Why You Need Both Metrics (They Measure Different Things)

Schedule adherence measures plan accuracy; on-time delivery measures customer satisfaction. Learn why tracking both reveals root causes that neither metric shows alone.

April 27, 202611 min read
Factory workers in protective gear operating industrial machinery in a manufacturing plant
Production Scheduling

Shift Scheduling and Production Scheduling: The Link Most Planners Miss

How 2-shift vs. 3-shift decisions directly impact production schedule throughput. Learn available capacity math, bottleneck shift strategies, and when to add a shift vs. add equipment.

April 27, 202612 min read
Large manufacturing warehouse with organized shelves showing the scale of supply chain operations
Supply Chain

The Bullwhip Effect in Manufacturing: Why Small Demand Changes Wreck Your Supply Chain

Understand the bullwhip effect in manufacturing supply chains - why a 5% demand change becomes a 40% swing upstream, and how to dampen it with better scheduling.

April 27, 202612 min read
Warehouse workers processing shipments on a fulfillment line in a manufacturing facility
Manufacturing KPIs

Perfect Order Fulfillment: The Composite KPI That Drives B2B Customer Satisfaction

Perfect Order Fulfillment measures on-time, complete, undamaged, and correctly invoiced orders. Learn the formula, benchmarks, and how scheduling accuracy drives POF.

April 27, 202611 min read
Industrial factory interior with conveyor system showing production flow and work-in-process
Finite Capacity Planning

Queue Time: The Biggest Scheduling Lever You're Not Managing

In most job shops, queue time is 80-90% of total lead time. Learn how to manage queue time, apply Little's Law, and use finite capacity scheduling to cut it.

April 27, 202611 min read
Production planner reviewing a complex scheduling whiteboard calendar in manufacturing office
Production Scheduling

Schedule Nervousness: Why Your Planners Ignore the Production Schedule (And How to Fix It)

Schedule nervousness destroys planner trust and floor execution. Learn what causes it, how time fences fix it, and why a stable 90% schedule beats a volatile 100%-optimal one.

April 27, 202611 min read