Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
EDGEBIC for 3D Printing: Scheduling Printer Pools and Long Builds
Additive manufacturing scheduling in EDGEBIC: work center groups pool identical printers, and multi-shift capacity plans the long unattended builds that run overnight.
EDGEBIC for Cosmetics: Batch Scheduling and Changeovers
Cosmetics and personal care batch scheduling in EDGEBIC: sequence fragrance, color, and allergen changeovers to cut sanitation time and keep compounding lines running.
EDGEBIC for Industrial Equipment: Make-to-Order Scheduling
Make-to-order scheduling for industrial equipment in EDGEBIC: backward-schedule from the due date, coordinate multi-level sub-assemblies, and quote honest promise dates.
EDGEBIC for Rubber and Elastomer: Compound Changeovers
Rubber and elastomer production scheduling in EDGEBIC: price compound and color changeovers in a setup matrix and model curing ovens as continuous-process work centers.
EDGEBIC for Semiconductor Scheduling: Recipe Changeovers
Semiconductor production scheduling in EDGEBIC: a sequence-dependent setup matrix prices every recipe changeover on shared tools so lot sequence stops burning capacity.
EDGEBIC for Sheet Metal: Scheduling Around Your Nests
Sheet metal fabrication scheduling in EDGEBIC: sequence nested cut jobs by material and gauge, route across laser and punch machines, and plan the brake bottleneck.
Inside EDGEBIC's Self-Documenting Reports: A Deep Dive
How EDGEBIC's report glossary works under the hood: structured column definitions with formulas, examples, and linked terms that serve both planners and AI agents.
From Sales Order to MPS to Schedule in EDGEBIC
Follow one customer order through EDGEBIC end to end: confirmed sales line to firm demand, MPS commit and firm, build-to-stock order, and finite-capacity schedule.
Greater-Of vs Minus-Consumed: Forecast Consumption Rules in EDGEBIC
How EDGEBIC's two forecast consumption rules stop firm orders and forecasts double-counting the same demand, with worked numbers for choosing between them.
How a Forecast Becomes a Replenishment Suggestion in EDGEBIC
Follow the exact path a demand forecast takes to become a build suggestion: gross requirements, projected balance, reorder trigger, lot sizing, and yield.
How a Plan Absorbs a Late Material Delivery
How a finite capacity plan reflects a late material delivery: model the arrival as a material step or job start, reschedule, and let downstream shift while completed work stays.
How a Reschedule Keeps Inventory Consistent in EDGEBIC
Reschedule the same order twice and on-hand still reconciles. Here is the reverse-then-repost design that keeps at most one live consume issue per order.
