Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Troubleshooting
Troubleshooting

A Job Shows Fewer Hours Than Its Routing Requires

When a job's scheduled hours fall short of its routing math, the cause is usually partial-completion accounting or an alternate work center with a speed factor. How to read it.

August 1, 20267 min read
Troubleshooting
Troubleshooting

A Job Was Booked During a Machine Downtime Window

When a job schedules inside a maintenance window, the closure was almost always entered after the last run. How to model machine downtime today, and how to clear the booking.

August 1, 20267 min read
Troubleshooting
Troubleshooting

A Job's Schedule Bar Is Wider Than Its Hours Suggest

When a Gantt bar spans far more calendar time than the work hours, the cause is a low utilization cap on the order, high queue time, a large setup charge, or shifts spread thin.

August 1, 20267 min read
Troubleshooting
Troubleshooting

A Schedule Points to a Deleted Work Center

When a schedule references a work center that was deleted, reports cannot resolve it. Restore the machine or reassign the routing step, then re-run scheduling.

August 1, 20267 min read
Troubleshooting
Troubleshooting

A Work Center Shows More Hours Than It Has: The Causes

When a work center's daily booking exceeds its physical hours, it is one of three causes: synchronized machines, stale reschedule rows, or an understated instance count.

August 1, 20267 min read
Troubleshooting
Troubleshooting

An Anchored Job Did Not Hit Its Target Date

When a bottleneck-anchored job fails to schedule to its target, the cause is bottleneck capacity, a past target date, or feeder steps that cannot finish in time.

August 1, 20267 min read
Scheduling Concepts
Scheduling Concepts

Capacity vs Throughput in Manufacturing Scheduling

Capacity is the hours a shop could run; throughput is the good output it actually ships. Here is why the two diverge and why adding capacity off the bottleneck adds nothing.

August 1, 20268 min read
Inventory & Planning
Inventory & Planning

Choosing a Planning Bucket: Day, Week, or Period in EDGEBIC

EDGEBIC plans demand and supply in buckets of a day, a week, or a 28-day period. Here is how each granularity behaves and how to pick the right one for a product.

August 1, 20268 min read
Inventory & Planning
Inventory & Planning

Demand Fence vs Planning Fence in EDGEBIC

The two time fences in EDGEBIC's MPS suppress different things: the demand fence hides stale forecast, the planning fence protects committed builds. Here is how each works.

August 1, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

The EDGEBIC Control Tower: A Roadmap Vision, Not Yet Built

The EDGEBIC Control Tower is a documented roadmap vision, not a shipped feature. Here is what it would show, and the real capabilities that exist in EDGEBIC today.

August 1, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

The EDGEBIC Data Snapshot: A Faster Path to Support Answers

How the EDGEBIC data snapshot pulls your job records and runs integrity checks so support can answer why does my schedule look wrong in minutes, not days.

August 1, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

SQLite or SQL Server: EDGEBIC Database Options for IT Buyers

EDGEBIC database options for IT: when to run the local SQLite database versus shared SQL Server, how the two scale, and how to move between them without a rewrite.

August 1, 20269 min read
Let's Solve Your Challenges Together