Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Shop Floor Execution
Shop Floor Execution

What the EDGEBIC Kiosk Does When the Network Drops

The kiosk reads and writes the shared database live and has no offline mode. Learn the honest fallback: punch when the connection returns or use Manual Entry after the fact.

August 2, 20267 min read
Inventory & Planning
Inventory & Planning

When Safety Stock Becomes a Hard Floor in EDGEBIC

Safety stock in EDGEBIC is a replenishment trigger by default, not a consumption floor. Learn the difference, when to make it a hard floor, and why the default lets stock go below it.

August 2, 20267 min read
Scheduling Concepts
Scheduling Concepts

Why a Bottleneck Needs a Target Date to Anchor a Schedule

Why marking a work center as the bottleneck is not enough to trigger anchor scheduling in EDGEBIC, and how a target start date on the constraint step activates it.

August 2, 20268 min read
Inventory & Planning
Inventory & Planning

Why a Replenishment Suggestion Does Not Lift Projected Balance Until You Firm It

In EDGEBIC a replenishment suggestion is advice, not supply. Learn why it does not roll into projected balance, why later buckets still show shortfalls, and what firming changes.

August 2, 20267 min read
Outcomes & ROI
Outcomes & ROI

Why a Stable Schedule Cuts Your Premium Freight Bill

Air freight and hot-shot trucking are the price of a schedule that surprised you late. Stable, honest scheduling moves the surprise weeks earlier, when ground freight still works.

August 2, 20269 min read
Scheduling Concepts
Scheduling Concepts

Why Finite Scheduling Shrinks Lead Times

Finite scheduling shrinks lead times by exposing hidden queue, sequencing out idle gaps, and overlapping steps with transfer batches. See the mechanism with worked numbers.

August 2, 20268 min read
Inventory & Planning
Inventory & Planning

Why Negative Projected Balance and ATP Are Information in EDGEBIC

A negative projected balance or available-to-promise in EDGEBIC is a signal, not an error. Learn what below-zero numbers mean, why the plan surfaces them, and how to resolve them.

August 2, 20266 min read
Inventory & Planning
Inventory & Planning

Why Overdue Orders Pile Into Today's Planning Bucket in EDGEBIC

In EDGEBIC, overdue supply and demand clamp into today's planning bucket so nothing vanishes into the past. Learn how to read the pile-up and clear the backlog it exposes.

August 2, 20266 min read
Scheduling Concepts
Scheduling Concepts

Why Sequence Matters More Than Speed on a Setup-Heavy Line

On a setup-heavy line, the order you run jobs in beats raw machine speed, because changeover time dominates. See why resequencing can beat a faster machine, with worked numbers.

August 2, 20268 min read
Troubleshooting
Troubleshooting

A Booking Falls Outside Its Shift Hours

When an operation's clock window runs outside the shift's working hours, a work-center shift override or a changed shift is usually the cause. Align the hours and re-run.

August 1, 20267 min read
Troubleshooting
Troubleshooting

A Booking Points to a Machine Unit That Is Gone

An orphan instance booking references a machine unit that was removed after scheduling. Restore the unit or re-run the schedule so the engine picks a live instance.

August 1, 20267 min read
Troubleshooting
Troubleshooting

A Job Shows a Zero-Length Bar on the Gantt

A zero-width or backwards schedule bar means the operation has no duration: the usual cause is a routing step with zero hours and zero setup, and the fix is quick.

August 1, 20267 min read