Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Worked Examples
Worked Examples

Planning a Month of Preventive Maintenance and Scheduling Around It

A preventive maintenance walkthrough in EDGEBIC: list what is due, pick the cheapest days from the utilization heatmap, block the hours, and reschedule.

August 8, 20269 min read
Visual Scheduling
Visual Scheduling

Reading Parallel and Alternate Branches on the EDGEBIC Canvas

Three connector types, three very different meanings. How the EDGEBIC routing designer draws a sequential step, a parallel machine, and a true alternative.

August 8, 20268 min read
Worked Examples
Worked Examples

Rescheduling Around a Late Material Delivery, Start to Finish

A late material delivery walkthrough in EDGEBIC: move the material's ready date, reschedule one job, read the new promise, and reclaim the freed capacity.

August 8, 20269 min read
Visual Scheduling
Visual Scheduling

Sharing a Gantt Configuration Across Planners in EDGEBIC

Tune the schedule display once, then export it and import it everywhere. How EDGEBIC separates per-machine display settings from site-wide scheduling policy.

August 8, 20267 min read
Worked Examples
Worked Examples

Shipping a Step Out to a Plating Vendor and Back: A Transit Days Walkthrough

An outside operation scheduling walkthrough in EDGEBIC: model a plating vendor's turnaround with transit days, pick calendar or working days, and watch the job's finish date move.

August 8, 20269 min read
Visual Scheduling
Visual Scheduling

Showing Live Progress on Routing Diagram Nodes in EDGEBIC

Turn a routing diagram into a status board: how Node Display Fields put planned hours, actual hours, and dates under each node of a scheduled job.

August 8, 20267 min read
Visual Scheduling
Visual Scheduling

The Status Strip and the Legend on the EDGEBIC Gantt

Two small parts of a production Gantt do the heaviest reading work: the per-bar status strip and the legend generated from your own state configuration.

August 8, 20267 min read
Troubleshooting
Troubleshooting

Two Jobs Landed on the Same One-Per-Day Machine: Causes and Fixes

When a one-job-per-day machine unit shows two jobs on the same date, the cause is a stale allocation, a synchronized mirror, or too few units. How to tell which and fix it.

August 8, 20266 min read
Visual Scheduling
Visual Scheduling

What Decides Which Operations Appear on the EDGEBIC Gantt

The schedule board is a filtered picture, not the whole database. The five gates that decide whether an operation draws a bar, in the order worth checking them.

August 8, 20268 min read
Visual Scheduling
Visual Scheduling

What Each Segment of a Gantt Bar Means in EDGEBIC

Read a Gantt bar segment by segment: setup, run, queue, teardown, and move time, plus the display toggles that decide which parts of an operation you see.

August 8, 20267 min read
Visual Scheduling
Visual Scheduling

What Happens When You Resize a Gantt Bar in EDGEBIC

Stretching a schedule bar records dates, not hours. What a resize actually writes in EDGEBIC, what it leaves alone, and when to change the routing step instead.

August 8, 20268 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a BOR Chain Issue in a Routing?

A BOR chain issue is a broken link between routing steps: a dangling reference, a cycle, or a missing successor. Learn the three kinds and how each one breaks a schedule.

August 8, 20266 min read