Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

EDGEBIC How-To
EDGEBIC How-To

How to Choose a Schedule Lane Mode in EDGEBIC

The View by setting decides what the Schedule View lanes represent: WorkCenter, ResourceGroup, Job, Planner, or Operator. How to switch, and which one answers which question.

August 21, 20266 min read
Visual Scheduling
Visual Scheduling

Staged Changes on the EDGEBIC Planner Board

Nothing on the Planner board is written until you press Save Changes, and a machine-only change writes no actual dates at all. What staging protects, and what saving actually records.

August 20, 20267 min read
Visual Scheduling
Visual Scheduling

Why EDGEBIC Refuses a Drop on the Planner Board

A refused drop is never silent and never destructive. EDGEBIC keeps the machine, keeps your time shift, and puts the reason on the status line. Here is every refusal and what it means.

August 20, 20267 min read
Visual Scheduling
Visual Scheduling

Why Planner View Focus Is Never Saved in EDGEBIC

Clicking a bar re-orders the machine block for as long as you are looking at it. It is a way of seeing, not a setting, so it never touches your saved configuration.

August 19, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Float the Machines That Matter in the EDGEBIC Planner View

Click an operation's bar and the machine block re-sorts around it: the current machine, then its group's active members, then the rest of the job's routing. Click again to release.

August 19, 20265 min read
EDGEBIC How-To
EDGEBIC How-To

How to Run the Schedule Reconciliation Report in EDGEBIC

Open the reconciliation checklist, read the eight parameter chips, work the two exception grids, and finish when both are empty.

August 19, 20266 min read
EDGEBIC How-To
EDGEBIC How-To

How to Work the Reconciliation Exception Rows in EDGEBIC

Each reconciliation row names the number that triggered it and the next step. Here is the order to take them in and where each drill-down lands.

August 19, 20266 min read
Shop Floor Execution
Shop Floor Execution

The Schedule Reconciliation Report in EDGEBIC, Explained

Eight parameter checks over two exception grids. See how EDGEBIC reconciles the plan against the plant and shows only the rows that disagree.

August 19, 20268 min read
Shop Floor Execution
Shop Floor Execution

Why a Dependent-Parallel Child Is Exempt From the Over-Booked Check

Three synchronized drills book 24 hours on an 8 hour day. That is real plant behavior, not a capacity breach, and flagging it would make the whole check useless.

August 19, 20267 min read
Visual Scheduling
Visual Scheduling

Dropping an Operation Back on Its Own Machine in EDGEBIC

On the Planner board, dropping an operation on the machine it already runs on is read as a re-time, never as a second assignment. And a drop with no time change stages nothing at all.

August 18, 20266 min read
Troubleshooting
Troubleshooting

An Operation Moved and the Machine Was Free: Finding the Hidden Cause

A job slid and every machine shows open hours. Tooling is the cause the Gantt cannot draw. How to rule it in or out in two minutes before you chase calendars.

August 18, 20267 min read
EDGEBIC How-To
EDGEBIC How-To

How to Assign an Operation to a Machine in the EDGEBIC Planner View

Drag an operation out of its job lane and drop it on the machine you want it to run on. The machine change and the time change stage together as one edit.

August 18, 20265 min read
Let's Solve Your Challenges Together