Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
How to Choose a Schedule Lane Mode in EDGEBIC
The View by setting decides what the Schedule View lanes represent: WorkCenter, ResourceGroup, Job, Planner, or Operator. How to switch, and which one answers which question.
Staged Changes on the EDGEBIC Planner Board
Nothing on the Planner board is written until you press Save Changes, and a machine-only change writes no actual dates at all. What staging protects, and what saving actually records.
Why EDGEBIC Refuses a Drop on the Planner Board
A refused drop is never silent and never destructive. EDGEBIC keeps the machine, keeps your time shift, and puts the reason on the status line. Here is every refusal and what it means.
Why Planner View Focus Is Never Saved in EDGEBIC
Clicking a bar re-orders the machine block for as long as you are looking at it. It is a way of seeing, not a setting, so it never touches your saved configuration.
How to Float the Machines That Matter in the EDGEBIC Planner View
Click an operation's bar and the machine block re-sorts around it: the current machine, then its group's active members, then the rest of the job's routing. Click again to release.
How to Run the Schedule Reconciliation Report in EDGEBIC
Open the reconciliation checklist, read the eight parameter chips, work the two exception grids, and finish when both are empty.
How to Work the Reconciliation Exception Rows in EDGEBIC
Each reconciliation row names the number that triggered it and the next step. Here is the order to take them in and where each drill-down lands.
The Schedule Reconciliation Report in EDGEBIC, Explained
Eight parameter checks over two exception grids. See how EDGEBIC reconciles the plan against the plant and shows only the rows that disagree.
Why a Dependent-Parallel Child Is Exempt From the Over-Booked Check
Three synchronized drills book 24 hours on an 8 hour day. That is real plant behavior, not a capacity breach, and flagging it would make the whole check useless.
Dropping an Operation Back on Its Own Machine in EDGEBIC
On the Planner board, dropping an operation on the machine it already runs on is read as a re-time, never as a second assignment. And a drop with no time change stages nothing at all.
An Operation Moved and the Machine Was Free: Finding the Hidden Cause
A job slid and every machine shows open hours. Tooling is the cause the Gantt cannot draw. How to rule it in or out in two minutes before you chase calendars.
How to Assign an Operation to a Machine in the EDGEBIC Planner View
Drag an operation out of its job lane and drop it on the machine you want it to run on. The machine change and the time change stage together as one edit.
