Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
How to Set Up Work Centers in EDGEBIC: A Field-by-Field Guide
How to set up work centers step by step: every field on the configuration dialog, what it changes, the shift calendar choice, and the per-day capacity override.
How to Use Column Details in EDGEBIC
Report column definitions without a manual: how to open Column Details in any EDGEBIC report, read the formula and examples, and follow the see-also links.
How to Set Up and Use the EDGEBIC Dashboard Tabs
Production dashboard setup in EDGEBIC: prerequisites, tile and threshold settings, the resource calendar controls, and opening a per-day capacity override.
How to Work the MPS Grid in EDGEBIC, Bucket by Bucket
A step-by-step guide to the master production schedule grid in EDGEBIC: set up the product, read the columns, commit a build quantity, and firm it.
How to Update the Routing on a Scheduled Job in EDGEBIC
Update routing on scheduled job safely: find the job's frozen copy, compare it to the master, pick one of three controls, then verify before the floor sees it.
7 Ways Plants Ignore Schedule Warning Signs (and What It Costs)
Schedule warning signs manufacturing planners dismiss: unread diagnostics, filtered scans that hide findings, and settings switched off instead of data fixed.
8 Data Import Mistakes That Cost Manufacturers a Week
Data import mistakes manufacturing teams repeat: unmapped required fields, missing unit conversions, split routing files, and zeros that overwrite good values.
Inside an EDGEBIC Scheduling Run: The Phases of One Pass
How a scheduling engine works phase by phase: pre-flight validation, capacity rebuild, order sort, and the per-job pipeline that produces every date on the grid.
Eight Instance and Utilization Mistakes That Produce Unhittable Plans
Machine utilization setting mistakes are silent: wrong instance counts, mixed pools, One Per Day on the wrong machine, headroom that lives nowhere. With fixes.
8 Manufacturing Inventory Mistakes That Quietly Break Your Schedule
Manufacturing inventory mistakes rarely announce themselves. Here are eight configuration errors, the symptom each produces, and the check that catches it.
JobBOSS to EDGEBIC: The Data Mapping Reference
JobBOSS data export scheduling field by field: map parts, work centers, routings, orders, and actuals into EDGEBIC import masks with unit conversions.
Locked Jobs and the Never-Worse Guarantee in EDGEBIC
The schedule optimizer guarantees in EDGEBIC: why the never-worse clamp is enforced not promised, why some jobs reproduce exactly, and what determinism buys.
