EDGEBIC How-To
EDGEBIC How-To

How to Zoom the Gantt Timeline in EDGEBIC

Zoom the Gantt timeline in EDGEBIC: use the right-click timescale zoom, grow or shrink the horizon by a month, jump to Today, and switch Hour/Day/Week/Month views.

July 27, 20266 min read
Troubleshooting
Troubleshooting

Lot Streaming Did Not Overlap My Operations: Causes and Fixes

You set up lot streaming but the downstream step still waits for the full upstream lot. The four documented reasons a transfer batch or flow lag stops working, and how to fix each.

July 27, 20267 min read
Troubleshooting
Troubleshooting

My Actual Hours Did Not Reduce the Remaining Work: Causes and Fixes

Logging hours records them, but the remaining balance only recalculates on the next reschedule. Why logged hours can look like they had no effect, and how to make them count.

July 27, 20266 min read
Troubleshooting
Troubleshooting

My Schedule Runs Too Far Into the Future: Causes and Fixes

A schedule that lands weeks or months out is almost always a capacity or start-date constraint, not a bug. How to find the constraint pushing your jobs out and clear it.

July 27, 20267 min read
Troubleshooting
Troubleshooting

My Transfer Batch Size Was Ignored: Causes and Fixes

When a transfer batch size has no effect on the schedule, the cause is a continuous-process machine, a batch as large as the order, or a competing flow step. How to tell which.

July 27, 20266 min read
Troubleshooting
Troubleshooting

Queue Time and Flow Time Are Fighting Each Other: Causes and Fixes

When a step has both queue time and a flow step, the flow gate replaces the queue buffer and the downstream step can start too early. Why it happens and how to set them so they cooperate.

July 27, 20266 min read
Troubleshooting
Troubleshooting

The Optimizer Made My Schedule Worse: Why It Almost Never Did

The optimizer is clamped to be never worse than your current schedule, so a worse result is almost always a misread: a proposal not yet accepted, a different goal, or locked jobs.

July 27, 20267 min read
Troubleshooting
Troubleshooting

The Same Machine Is Double-Booked Across Two Jobs: Causes and Fixes

You have confirmed a real cross-job collision on one machine instance. The documented root causes are stale reservations, a synchronized-mirror capacity gap, and a wrong instance count.

July 27, 20267 min read
Troubleshooting
Troubleshooting

The Setup Matrix Is Not Being Applied: Causes and Fixes

When changeover times fall back to the routing default instead of your sequence-dependent matrix, the cause is a missing cell, an unassigned family, or stale entries. How to tell which.

July 27, 20267 min read
Troubleshooting
Troubleshooting

A Job Disappeared From the Schedule: Where It Actually Went

A job that vanished from the Gantt is rarely lost. Four documented explanations: a filter hiding it, the mode skipping it, a stock fulfillment, or a failure you have not read yet.

July 26, 20267 min read
Troubleshooting
Troubleshooting

A Job Will Not Schedule At All: Reading the Failure and Fixing It

A job that comes back unscheduled has one of four documented causes. How to read the failure dialog, tell which cause you have, and fix each one at the source.

July 26, 20267 min read
Troubleshooting
Troubleshooting

A Step Is Waiting and I Cannot See Why: Tracing the Delay

A step that starts later than its predecessor ended usually has a configured reason: queue time, transit, an overlap gate, a busy machine, or a missing operator. How to find which.

July 26, 20267 min read