Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

EDGEBIC How-To
EDGEBIC How-To

How to Use the Standup Dashboard in EDGEBIC

Use the standup dashboard tab in EDGEBIC for the morning meeting: the SQDC band, an inferred Andon strip, the late-jobs list, and the bottleneck panel on a floor screen.

July 28, 20266 min read
Troubleshooting
Troubleshooting

Inventory On-Hand Looks Wrong After a Reschedule

On-hand is a cache over an append-only ledger, so a wrong figure after a reschedule usually traces to cache drift, an in-flight build, or a missing consume issue. How to reconcile.

July 28, 20266 min read
Troubleshooting
Troubleshooting

My Imported Hours Came In Wrong: Minutes, Hours, and the Conversion Factor

Imported setup or run hours that are 60 times too big or too small almost always trace to a units mismatch. How to read the conversion factor and fix an import mask.

July 28, 20266 min read
Troubleshooting
Troubleshooting

My MPS Firmed Quantity Did Not Become a Job

A master schedule quantity turns into a build order only when you firm it, and only a make-to-stock product qualifies. How to tell a saved row from a firmed one and fix it.

July 28, 20266 min read
Troubleshooting
Troubleshooting

My Partial Holiday Reduced Too Much or Too Little Capacity

A partial-day holiday scales by instances and utilization and only counts the overlap with the shift. How to read the math and fix an over- or under-cut.

July 28, 20266 min read
Troubleshooting
Troubleshooting

The Optimizer Will Not Improve a Job I Know Can Move

When the solver leaves one job exactly where it is, its routing usually carries a feature the solver does not model natively, so the job is locked on purpose. How to read the reason and act.

July 28, 20266 min read
Troubleshooting
Troubleshooting

The Quote Promised Date Does Not Match the Real Schedule

A quote simulation runs in memory and reserves no capacity, so the real plan can differ once other jobs load, the routing changes, or assumptions diverge. How to reconcile them.

July 28, 20266 min read
Troubleshooting
Troubleshooting

The Same Job Shows Different Hours in Two Places

Two screens disagreeing on a job's hours usually means one reads the estimate and the other the schedule, or two internal stores drifted. How to find the true number.

July 28, 20266 min read
Troubleshooting
Troubleshooting

The Schedule Did Not Use My Second Shift: Where to Look

A second shift the scheduler ignores usually is not assigned to the work center, has no hours for the day, or was simply not needed. How to tell which and fix it.

July 28, 20266 min read
Troubleshooting
Troubleshooting

A Completed Job Moved When I Rescheduled: Why It Almost Never Did

Completed work is never moved by a reschedule. When it looks like it did, the cause is a missing actual end date, a partial step's forward split, or a stale view. How to tell.

July 27, 20266 min read
Troubleshooting
Troubleshooting

A Holiday Did Not Reduce Capacity: Causes and Fixes

When a holiday you added leaves capacity untouched, the cause is usually a holiday added after the last run, the wrong holiday level, or an override holding the day open. How to tell.

July 27, 20267 min read
Troubleshooting
Troubleshooting

A Parallel Operation Did Not Mirror: Causes and Fixes

When a dependent parallel operation's partner machines do not show matching times, the cause is a shared-shift gap, a failed parent, or a miswired parallel setting. How to tell which.

July 27, 20267 min read
Let's Solve Your Challenges Together