Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Scheduling Concepts
Scheduling Concepts

How Sequence-Dependent Setup Shapes a Schedule

How EDGEBIC uses a per-machine setup matrix to price changeovers by what ran before, turning a deceptive plan into an honest one and an honest one into an efficient one.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

How Transit Time Between Plants Affects a Schedule

How EDGEBIC models the days a job spends leaving the building: calendar-day versus working-day transit, and how it composes with queue time and lot streaming.

July 29, 20267 min read
Scheduling Concepts
Scheduling Concepts

Load Balancing vs Dedicated Instance Scheduling

Load balancing vs dedicated instance scheduling: how a finite capacity engine splits work across machines, when one job per instance wins, and worked numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

Piece Count vs Time Lag Lot Streaming: Which to Use

Piece count vs time lag lot streaming: when to overlap operations by transfer batch pieces, when a start-to-start hour lag fits, and worked numbers.

July 29, 20268 min read
Scheduling Concepts
Scheduling Concepts

Push vs Pull Scheduling in a Finite Capacity System

Push vs pull scheduling in a finite capacity system: forward start-as-soon-as-possible against backward JIT right-alignment, the trade-off, and worked dates.

July 29, 20268 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Bill of Routing (BOR)? Definition and Example

A bill of routing lists the manufacturing steps, work center, and time for each operation to make a product. Definition, a worked example, and how EDGEBIC uses it.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Bottleneck Utilization Metric? EDGEBIC Definition

A bottleneck utilization metric measures the load on the constraint machine. See how EDGEBIC computes today and seven-day load on the flagged bottleneck.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Capacity Override in Scheduling?

A capacity override replaces a work center's calculated capacity for a specific day or range. Definition, the priority order, and how EDGEBIC applies it to the plan.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Column Glossary in Reporting? EDGEBIC Definition

A column glossary is built-in documentation for every report column: its definition, formula, unit, and examples. See how EDGEBIC's Column Details makes reports self-explaining.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Constraint Buffer?

A constraint buffer is protected time in front of a bottleneck that absorbs upstream delays. Learn how constraint, feeding, and shipping buffers are sized.

July 29, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Daily Hour Breakdown? Definition and Example

A daily hour breakdown records planned and actual hours (and pieces) per day for one scheduled operation. Definition, a worked example, and how EDGEBIC uses it.

July 29, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Dependency Violation in Scheduling?

A dependency violation is when a routing step starts before the step it depends on has finished. Definition, when overlap is legitimate, and how EDGEBIC flags it.

July 29, 20265 min read
Let's Solve Your Challenges Together