What Is a Drag Write Mode in a Production Gantt?

A drag write mode decides what a saved Gantt drag actually records: that work happened, that work started, or that work is planned for later. Same gesture, three meanings.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Grid Export Snapshot?

A grid export snapshot is an Excel file reproducing exactly what a grid shows, in its current sort and filter order. Learn why it is for sharing and never for re-importing.

August 14, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a History Bucket in Inventory Projection?

A history bucket is a projection period in the past that reports only what really moved. Learn why it ignores plan, forecast, and suggestions, and how to read it.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Late-Start Penalty in Scheduling?

A late-start penalty is the capacity a shift loses when an operation only becomes eligible partway through it. Learn why a machine can show free hours and still schedule nothing.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Load Factor in Constraint Scheduling?

A load factor is one work center's demand hours for a job divided by the hours that work center can supply in a day. Learn how the ratio identifies the tightest resource.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Manual Cost Override on a Quote?

A manual cost override replaces the calculated cost basis on a quote without hiding the calculated split. See when to use it and why it beats fudging the price.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Minimum Allocation Threshold in Scheduling?

A minimum allocation threshold is the smallest booking a scheduler will write, stopping a plan from filling with second-long slivers of capacity. Learn why the floor exists.

August 14, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Password Policy?

A password policy is the minimum standard every account password must meet. See EDGEBIC's default rule, where the hint appears, and how forced changes work.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Pending Schedule Change in Scheduling?

A pending schedule change is an edit staged on the scheduling board but not yet written. Learn why staging exists, what it protects, and why pending work lives only on one screen.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Prior Operations Safety Prompt in Scheduling?

A prior operations safety prompt fires when you log actuals on a step whose earlier steps have none. It offers to fill the gap from plan, or to send you back to log it properly.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Procured Item in Manufacturing?

A procured item is a product you buy rather than make. Learn how the procured flag separates purchased inputs from manufactured products, and why it has no routing.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Product Category in Manufacturing Software?

A product category is a named grouping on the product master that organizes the catalog for filtering and reporting. Learn what it controls and what it deliberately does not.

August 14, 20265 min read