Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Visual Scheduling
Visual Scheduling

Save vs Re-Schedule: Two Different Buttons on the EDGEBIC Gantt

Save records your dragged dates without re-checking capacity, while Re-Schedule re-plans only the jobs you touched. Knowing the difference is the key to the EDGEBIC Gantt.

August 3, 20268 min read
Visual Scheduling
Visual Scheduling

Staging Schedule Changes: Save and Discard on the EDGEBIC Gantt

Staging schedule changes before saving keeps EDGEBIC edits safe: dragged bars go pending, nothing hits the database until Save Changes, and Discard reverts them all.

August 3, 20268 min read
Visual Scheduling
Visual Scheduling

The Gantt Right-Click Menu: Every Operation Action in EDGEBIC

The EDGEBIC Gantt right-click menu puts exact moves, actuals logging, locking, and cleanup on one operation bar, so you can act precisely instead of dragging by eye.

August 3, 20268 min read
Visual Scheduling
Visual Scheduling

The Job View Cockpit: One Job in Full Depth in EDGEBIC

The Job View tab in EDGEBIC is a single-job cockpit: a summary panel, an hours roll-up of total, actual, remaining, and percent complete, a per-operation grid, and its own Gantt strip.

August 3, 20268 min read
Visual Scheduling
Visual Scheduling

The Lead-Time Tail: the EDGEBIC Gantt Bar You Cannot Drag

The lead-time tail on the EDGEBIC Gantt is a display-only bar between a job's last operation and its final availability date, so promised dates stay honest and it consumes no capacity.

August 3, 20267 min read
Visual Scheduling
Visual Scheduling

How Drag and Drop Shows the Downstream Ripple

When you drag one operation in EDGEBIC, the later steps that may now be out of sequence turn amber. See how the downstream ripple works and how to clear it.

July 31, 202610 min read
Visual Scheduling
Visual Scheduling

How the Designer Shows Sub-Assembly Branches

See how the EDGEBIC designer draws a sub-assembly branch: a star-marked node feeding a merge point, a routing that explodes at schedule time, and how to preview it.

July 31, 202610 min read
Visual Scheduling
Visual Scheduling

How the Gantt Shows a Job Spanning Shifts

See how the EDGEBIC Gantt draws an operation across shifts and days: bars follow shift calendars, skip weekends and holidays, and split work across instances.

July 31, 202610 min read
Visual Scheduling
Visual Scheduling

Reading Dependencies on the EDGEBIC Design Canvas

Learn to read routing dependencies on the EDGEBIC canvas: connector arrows carry next-in-sequence, branches merge, and a warning icon flags a broken chain.

July 31, 20269 min read
Visual Scheduling
Visual Scheduling

Reading Operation Description Fields on a Gantt Bar

Every EDGEBIC Gantt bar caption is built from tokens: job, product, dates, and hours. Learn to read the operation description fields and set them per work center.

July 31, 20269 min read
Visual Scheduling
Visual Scheduling

Reading the Work Center Lanes on the EDGEBIC Schedule

The EDGEBIC Gantt puts one lane per work center. Learn to read the lanes: bars stack per machine, instances share load, and moving between lanes reroutes a job.

July 31, 202610 min read
Visual Scheduling
Visual Scheduling

Spotting a Bottleneck on the EDGEBIC Gantt

Learn to spot a bottleneck on the EDGEBIC Gantt: a lane packed wall to wall, work stacking upstream, and downstream operations flagged for review after a change.

July 31, 202610 min read
Let's Solve Your Challenges Together