Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Blocker Hint on a Late Job?

A blocker hint is a one-line diagnosis on the Late Jobs report telling you where to dig first. Learn the three hints, what triggers each, and how to act.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Bootstrap Administrator Account?

The bootstrap administrator is the first account, created before anything else on a new database. Learn why it cannot be deleted and how to hand it over safely.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a BOR Split Around an Anchor Step?

A BOR split divides a routing into the steps feeding a pinned constraint and the steps after it, so one half schedules backward and the other forward from the same point.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Common Shift Requirement in Parallel Scheduling?

Machines that must run one operation together need a shared shift record, not just matching hours. Learn why identical shift times on separate records never intersect.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Credit Limit in Manufacturing Software?

A credit limit is the ceiling on what a customer may owe. In EDGEBIC it warns but never blocks an order. Learn what that means and how to use it well.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Cross-Shift Operation in Scheduling?

A cross-shift operation is one routing step whose hours are split across several shifts or days. Learn why its elapsed span and its worked hours are different numbers.

August 14, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Customer Id in Manufacturing Software?

A customer id is the short unique code that identifies a trading partner on every grid and dropdown. Learn how it differs from the name and why it should be stable.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Downstream Changed Flag in Scheduling?

A downstream changed flag marks operations that may now be out of sequence because something upstream of them was moved. It changes no data; it is a review list.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Drag Write Mode in a Production Gantt?

A drag write mode decides what a saved Gantt drag actually records: that work happened, that work started, or that work is planned for later. Same gesture, three meanings.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Grid Export Snapshot?

A grid export snapshot is an Excel file reproducing exactly what a grid shows, in its current sort and filter order. Learn why it is for sharing and never for re-importing.

August 14, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a History Bucket in Inventory Projection?

A history bucket is a projection period in the past that reports only what really moved. Learn why it ignores plan, forecast, and suggestions, and how to read it.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Late-Start Penalty in Scheduling?

A late-start penalty is the capacity a shift loses when an operation only becomes eligible partway through it. Learn why a machine can show free hours and still schedule nothing.

August 14, 20266 min read
Let's Solve Your Challenges Together