Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
How to Schedule a Job Backward From Its Due Date in EDGEBIC
Schedule backward from the due date: set the direction, use the cut off date, and handle the doesn't-fit popup with its editable dates and forward fallback.
How to Sequence Operations With Dependencies in EDGEBIC
Set up operation dependencies in a routing: next in sequence links, branching, joins, repeated work centers, and inserting a step into a live routing.
How to Set Queue, Flow, and Transit Times on an EDGEBIC Routing
Set queue time on a routing step by step: hours, transit days in calendar or working mode, transfer delay, and how to verify the result on the schedule.
How to Set Up Operators, Skills, and Rosters in EDGEBIC
Set up operator skills and rosters in EDGEBIC step by step: build the skills catalog, certify people with expiry dates, roster shifts, and gate a routing step.
How to Set Up Products in EDGEBIC, Field by Field
Set up product master data the right way: every field on the EDGEBIC product form, the order to fill them in, categories, imports, and what saving changes.
How to Set Up Shifts and Holidays in EDGEBIC, Step by Step
Set up shifts and holidays in the right order: build the weekly pattern, add whole-day and partial closures, then handle one-off days with capacity overrides.
How to Set Up Work Centers in EDGEBIC: A Field-by-Field Guide
How to set up work centers step by step: every field on the configuration dialog, what it changes, the shift calendar choice, and the per-day capacity override.
How to Use Column Details in EDGEBIC
Report column definitions without a manual: how to open Column Details in any EDGEBIC report, read the formula and examples, and follow the see-also links.
How to Set Up and Use the EDGEBIC Dashboard Tabs
Production dashboard setup in EDGEBIC: prerequisites, tile and threshold settings, the resource calendar controls, and opening a per-day capacity override.
How to Work the MPS Grid in EDGEBIC, Bucket by Bucket
A step-by-step guide to the master production schedule grid in EDGEBIC: set up the product, read the columns, commit a build quantity, and firm it.
How to Update the Routing on a Scheduled Job in EDGEBIC
Update routing on scheduled job safely: find the job's frozen copy, compare it to the master, pick one of three controls, then verify before the floor sees it.
7 Ways Plants Ignore Schedule Warning Signs (and What It Costs)
Schedule warning signs manufacturing planners dismiss: unread diagnostics, filtered scans that hide findings, and settings switched off instead of data fixed.
