Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
How to Schedule Around a Bottleneck Work Center in EDGEBIC
Step by step: flag the constraint, pin a target start date, enable TOC buffers, and verify the anchored plan so you can schedule around bottleneck work centers.
How to Log Actual Production Hours and Pieces in EDGEBIC
Log actual production hours step by step: set the actual start, fill the daily grid, handle the backfill prompt, and close an operation the right way.
How to Schedule Jobs Across Shifts in EDGEBIC
Step by step setup to schedule jobs across shifts in EDGEBIC: define shifts, assign them to work centers, set instances and utilization, then verify the split.
How to Organize Departments and Multiple Plants in EDGEBIC
Multi plant department setup for scheduling: create departments, assign work centers, set period capacity, and model a second site with transit days.
How to Overlap Operations in EDGEBIC: A Field-by-Field Setup Guide
Overlap operations in production scheduling: which routing fields to fill for transfer batch size, flow lag hours, and transfer delay, and how to verify.
How to Read the Inventory Projection in EDGEBIC, Column by Column
Read the inventory projection with confidence: what every column on a projection row means, the six matrix lenses, and the drill-down that explains any cell.
How to Record Receipts, Issues and Adjustments in EDGEBIC
Record inventory transactions in manufacturing without breaking the audit trail: the panes, fields and sign conventions behind receipts, issues and counts.
How to Reschedule Production in EDGEBIC Without Breaking Anything
How to reschedule production safely: the pre-flight checks, the three scope options, the run itself, and the four-point verification that takes 30 seconds.
How to Run and Read an Optimization in EDGEBIC
Run the schedule optimizer in EDGEBIC step by step: pick a goal and budget, read the verdict, badge, KPI table, and move list, then Accept or Discard safely.
How to Run and Read the Schedule Anomaly Report in EDGEBIC
Run a schedule anomaly report in EDGEBIC: job filter versus plant-wide, reading severity chips, clicking through to the record, and a weekly triage routine.
How to Run, Filter and Export Reports in EDGEBIC
Export manufacturing reports to Excel and PDF from EDGEBIC: the date-range dialog, inline filters, persistent grid layouts, and the multi-sheet workbooks.
How to Run the Production Scheduler in EDGEBIC, Step by Step
Run the production scheduler in EDGEBIC: prerequisites, the Drive Schedule workflow, the confirm dialog, and how to read Item Start, Job End and Days Late.