How to Add a Work Center in EDGEBIC (The Two-Minute Version)
To add a work center in EDGEBIC, open the Workcenter tab, click Add Work Center, and fill in three things: the WC Id, the number of machines, and whether this resource follows the plant calendar. Every other field on the dialog has a default that works. Those three decide whether the machine has capacity at all.
This is the fast path for one work center. If you want the full field-by-field reference, including cost per hour, effective dates, and the color settings that drive the Gantt, read how to set up work centers in EDGEBIC by User Solutions. This page covers the single task: getting one new machine into the plant model correctly.
Before You Start
- At least one shift exists. A work center with no working hours has zero capacity and never receives a job. Create your shifts first (how to add a second shift covers the dialog).
- You know the real machine count behind the name you are about to type.
- You know whether this machine runs the plant pattern or a different one.
- You have the hourly cost rate if quoting matters to you. It can be added later.
Step 1: Open the Work Center Management Page
Open the Workcenter tab from the main navigation. The Work Center Management page lists the plant's existing resources with columns for WC Id, Work Center Name, Instances, Shift Calendar, One Per Day, and Continuous-Process.
Scan the grid before you add anything. Half the "new work center" requests that reach a planner are really a rename of something that already exists.
Step 2: Click Add Work Center
Click Add Work Center (➕) on the toolbar. The Work Center Configuration dialog opens with the heading Add Work Center, on the Basic Information tab.
Step 3: Set the WC Id
WC Id is the stable identifier used everywhere: routing steps, schedules, reports, imports. It auto-generates, but override it with something a planner will recognize on a Gantt bar at a glance. CNC-Mill-1, Weld-1, Paint-Booth-1.
Pick a naming convention (function plus number) and keep it. Renaming a WC Id later means chasing every routing and import mask that references it.
Name is the display name and is optional. Use it for the detail the identifier cannot carry: Haas VF-3 mill.
Step 4: Set No.Instances
No.Instances is how many parallel, identical machines stand behind this one name. It defaults to 1.
The number multiplies capacity directly. A two-instance work center on an 08:00 to 16:00 shift offers 16 hours a day, not 8, and can run two eight-hour jobs at the same time. The rule for pooling is strict: same speed, same shifts, same tooling. Machines that are interchangeable but different belong in a Work Center Group instead, so each keeps its own calendar and speed. See changing the number of machines in a work center for the capacity math in detail.
Step 5: Decide the Calendar
Use Global Shifts is ticked by default. Leave it ticked and the work center immediately works every plant-wide shift, with no further calendar setup. That is the right answer for most machines.
Untick it only when this resource genuinely runs a different pattern: a mill staffed on nights, a cell closed Fridays, a subcontractor slot. That path is covered in giving one work center its own calendar.
Step 6: Fill the Optional Fields That Pay for Themselves
Two are worth the extra thirty seconds:
| Field | Why bother now |
|---|---|
| Cost per Hour | Quote simulations and cost rollups use this rate, and new routing steps inherit it. A blank rate quietly produces a zero-cost quote |
| Setup Time (hrs) | The default changeover time inherited by new routing steps on this work center. It is the last resort in the setup-time ladder, below the sequence-dependent matrix and the step's own value |
Back Color is worth setting too. A distinct bar color makes this work center readable on a crowded Gantt.
Step 7: Save
Click Save. The work center appears in the grid.
What Changes When You Save
| Surface | Effect |
|---|---|
| Work Center Management grid | Updates immediately, with the Shift Calendar badge showing Global or Custom |
| Routing step dropdowns | The work center becomes selectable right away |
| Resource Calendar and capacity views | Show the new capacity when refreshed |
| The current plan | Unchanged. Nothing schedules here until a routing uses it and Drive Schedule runs |
Saving master data never reschedules. That is deliberate: your promised dates do not shift under you because someone added a machine record at 3pm.
How to Check It Worked
- Find the new row on the Work Center Management grid. Confirm Instances matches the floor and Shift Calendar shows 🌐 Global (or Custom, if that was the intent).
- Open a routing and confirm the work center appears in the step's work center dropdown.
- Open the Resource Calendar and read the new work center's total capacity for a normal working day. On one instance and an eight-hour shift you should see 8 hours. If you see zero, work through why capacity shows zero for a work center.
- Point one routing step at it and run Drive Schedule. Bars in the work center's color confirm the whole chain.
Common Mistakes
Creating a second work center for identical machines. Two clones in one work center with No.Instances = 2 give the scheduler load-balancing for free. Two separate records force routings to choose one, and one machine sits idle while the other queues.
Leaving Effective Date set for a machine already on the floor. The scheduler treats the work center as unavailable before that date. It is meant for equipment not yet commissioned, and it produces a silent zero-capacity resource if used by accident.
Pooling unequal machines. An averaged speed across a fast machine and a slow one produces a plan that neither machine can hold. This is the first entry in our list of work center configuration mistakes for a reason.
Expecting the plan to update itself. The bars on screen were computed against the old plant model. Run Drive Schedule before you communicate any date.
Next
Adding the record is step one of four. Set the machine count deliberately, decide the calendar, and confirm capacity before anything routes here. For a machine you have not commissioned yet, how to set a work center effective date lets you route to it today while it offers capacity only from the day it arrives. The rest of the task library lives in the EDGEBIC how-to hub, and the platform overview is at /edgebic.
Expert Q&A: Deep Dive
Q: I added six work centers this morning and two of them show zero capacity on the Resource Calendar. The other four look right. What did I miss?
A: Check the Shift Calendar column on the Work Center Management grid first. A work center showing the green Global badge inherits every plant shift and gets hours automatically. One showing the amber Custom badge follows only the shifts on its own Associated Shifts list, so if that list is empty the machine has no working windows at all and reports zero. The second suspect is Effective Date: if you entered a commissioning date in the future, the scheduler treats the work center as unavailable until that date arrives. Is Available unticked produces the same symptom.
Q: Our new mill is identical to the two we already run as CNC-Mill-1. Do I add a third work center or bump the instance count?
A: If the three machines are true clones (same speed, same shifts, same tooling), raise No.Instances on the existing work center from 2 to 3 rather than creating a new record. Capacity goes from 16 hours a day to 24 on an eight-hour shift, and the engine load-balances jobs across the three instances without you routing anything differently. Create a separate work center only when something real differs: a different cycle time, a different calendar, or tooling that limits which parts it can run. Different-but-interchangeable machines belong in a Work Center Group.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.