ERP Scheduling Add-On for Job Shops
ERP scheduling built for the reality of job shops: high mix and low volume — every job is essentially custom, customer expedites override planned sequence daily, and profitability per job hidden until completed. Generic ERP scheduling ignores these constraints. We built ours around them — for 35+ years.
Why Job shops Need ERP Scheduling Add-On That Understands Their Floor
Job shops is not generic high mix. Every job shop decision is shaped by high mix and low volume — every job is essentially custom, every order is shaped by customer expedites override planned sequence daily, and every weekly plan gets disrupted by profitability per job hidden until completed. Off-the-shelf ERP scheduling tools were built for a textbook model of manufacturing that does not survive contact with a real job shops floor. Our erp scheduling add-on starts from the constraints — adds finite capacity scheduling to any erp system, modeled the way job shops actually run them.
- High mix and low volume — every job is essentially custom
- Customer expedites override planned sequence daily
- Profitability per job hidden until completed
- Capacity commitments made before complete routings exist
How Our ERP Scheduling Add-On Works for Job Shops
ERP Scheduling Add-On is a finite-capacity-aware scheduling engine purpose-built for the messiness of real manufacturing. For job shops — including general job shops — it handles high mix and low volume — every job is essentially custom, customer expedites override planned sequence daily, and profitability per job hidden until completed in a single Gantt-driven interface planners can actually use. Below is what that looks like in practice.
- Adds finite capacity scheduling to any ERP system
- Bi-directional sync with QuickBooks, Sage, Epicor, JobBOSS, Dynamics, E2
- No rip-and-replace — preserves existing ERP investment
- Single source of truth for work orders, routings, and capacity
What Job shops Get From ERP Scheduling Add-On
Outcome 1
Get real scheduling without the cost of a new ERP
Outcome 2
Keep your accounting and inventory data where it is
Outcome 3
Implementation measured in weeks, not quarters
Related Resources
Job Shops planners often combine erp scheduling add-on with these adjacent capabilities:
Job Shops ERP Scheduling Add-On FAQ
Ready to fix ERP scheduling for your job shops operation?
Get a live demo with your real production data — no slide deck. See ERP scheduling run against job shop reality.
