Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
What Are Estimated Work Hours on a Quote?
Estimated work hours are the real work a routing consumes, not the elapsed span between quoted start and end dates. Learn why the two differ and which one prices a job.
What Are Job Status Buckets on a Dashboard?
Late, Overdue, On time, and Early are the four exclusive slices every job falls into. Learn what separates late from overdue and why the fix differs.
What Are Production Hours in Shop-Floor Tracking?
Production hours are the run and rework time credited to a job, with setup, pause and downtime kept separately. Learn why the split protects operators and reports.
What Happens When the CP-SAT Solver Is Not Installed
You selected the mathematical solver in Options but the badge still says best of N tried. That is a deliberate fallback, not a fault, and here is how to confirm it and what you keep.
What Is a Blocker Hint on a Late Job?
A blocker hint is a one-line diagnosis on the Late Jobs report telling you where to dig first. Learn the three hints, what triggers each, and how to act.
What Is a Bootstrap Administrator Account?
The bootstrap administrator is the first account, created before anything else on a new database. Learn why it cannot be deleted and how to hand it over safely.
What Is a BOR Split Around an Anchor Step?
A BOR split divides a routing into the steps feeding a pinned constraint and the steps after it, so one half schedules backward and the other forward from the same point.
What Is a Common Shift Requirement in Parallel Scheduling?
Machines that must run one operation together need a shared shift record, not just matching hours. Learn why identical shift times on separate records never intersect.
What Is a Credit Limit in Manufacturing Software?
A credit limit is the ceiling on what a customer may owe. In EDGEBIC it warns but never blocks an order. Learn what that means and how to use it well.
What Is a Cross-Shift Operation in Scheduling?
A cross-shift operation is one routing step whose hours are split across several shifts or days. Learn why its elapsed span and its worked hours are different numbers.
What Is a Customer Id in Manufacturing Software?
A customer id is the short unique code that identifies a trading partner on every grid and dropdown. Learn how it differs from the name and why it should be stable.
What Is a Downstream Changed Flag in Scheduling?
A downstream changed flag marks operations that may now be out of sequence because something upstream of them was moved. It changes no data; it is a review list.