Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Are Estimated Work Hours on a Quote?

Estimated work hours are the real work a routing consumes, not the elapsed span between quoted start and end dates. Learn why the two differ and which one prices a job.

August 14, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Are Job Status Buckets on a Dashboard?

Late, Overdue, On time, and Early are the four exclusive slices every job falls into. Learn what separates late from overdue and why the fix differs.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Are Production Hours in Shop-Floor Tracking?

Production hours are the run and rework time credited to a job, with setup, pause and downtime kept separately. Learn why the split protects operators and reports.

August 14, 20265 min read
Schedule Optimization
Schedule Optimization

What Happens When the CP-SAT Solver Is Not Installed

You selected the mathematical solver in Options but the badge still says best of N tried. That is a deliberate fallback, not a fault, and here is how to confirm it and what you keep.

August 14, 20268 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Blocker Hint on a Late Job?

A blocker hint is a one-line diagnosis on the Late Jobs report telling you where to dig first. Learn the three hints, what triggers each, and how to act.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Bootstrap Administrator Account?

The bootstrap administrator is the first account, created before anything else on a new database. Learn why it cannot be deleted and how to hand it over safely.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a BOR Split Around an Anchor Step?

A BOR split divides a routing into the steps feeding a pinned constraint and the steps after it, so one half schedules backward and the other forward from the same point.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Common Shift Requirement in Parallel Scheduling?

Machines that must run one operation together need a shared shift record, not just matching hours. Learn why identical shift times on separate records never intersect.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Credit Limit in Manufacturing Software?

A credit limit is the ceiling on what a customer may owe. In EDGEBIC it warns but never blocks an order. Learn what that means and how to use it well.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Cross-Shift Operation in Scheduling?

A cross-shift operation is one routing step whose hours are split across several shifts or days. Learn why its elapsed span and its worked hours are different numbers.

August 14, 20265 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Customer Id in Manufacturing Software?

A customer id is the short unique code that identifies a trading partner on every grid and dropdown. Learn how it differs from the name and why it should be stable.

August 14, 20266 min read
Glossary (EDGEBIC)
Glossary (EDGEBIC)

What Is a Downstream Changed Flag in Scheduling?

A downstream changed flag marks operations that may now be out of sequence because something upstream of them was moved. It changes no data; it is a review list.

August 14, 20266 min read
Let's Solve Your Challenges Together