Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Inventory & Planning
Inventory & Planning

Why a Forecast Row Is Never Rewritten by Firm Demand in EDGEBIC

In EDGEBIC a forecast row never changes when firm orders consume it. Consumption is recomputed fresh each projection, so the same forecast yields different requirements over time.

August 5, 20267 min read
Inventory & Planning
Inventory & Planning

Why Material Planning and Finite Scheduling Are Two Passes in EDGEBIC

Material planning nets demand at infinite capacity to set a need date; finite scheduling re-times it against real machines. Here is why EDGEBIC keeps the two passes distinct.

August 5, 20267 min read
Troubleshooting
Troubleshooting

A Daily Capacity Override Was Ignored: Causes and Fixes

When a per-day capacity override does not change the schedule, the usual causes are a stale scheduling run, an override on a non-working day, or the wrong shift. How to tell which.

August 4, 20266 min read
Troubleshooting
Troubleshooting

A Resource Is Logged Against the Wrong Work Center

When a resource row credits a different machine than the operation's work center, resource-load reports mis-credit that machine. Why the mismatch appears and how a clean run corrects it.

August 4, 20266 min read
Troubleshooting
Troubleshooting

A Scheduled Operation Shows No Assigned Resources

When an operation has a bar on the Gantt but no resource or instance underneath it, the resource detail was not built on the last run. Why it happens and how a clean re-run restores it.

August 4, 20266 min read
Troubleshooting
Troubleshooting

A Shift That Crosses Midnight Logged Hours on the Wrong Day

When a night shift's hours all roll up to the day it started, that is usually shift-start-date anchoring working as designed, not a logging error. How to tell the two apart.

August 4, 20266 min read
Troubleshooting
Troubleshooting

A Sub-Assembly Scheduled Before Its Parent: Causes and Fixes

When a lower-level component step lands ahead of the parent step that needs it, the cause is usually a broken sequence link or two steps sharing one work center. How to trace it.

August 4, 20266 min read
Troubleshooting
Troubleshooting

A Work Center Group Step Did Not Explode: Causes and Fixes

A routing step bound to a machine pool that fails to shop the pool almost always points at a deactivated group, no active members, or a stripped binding. How to tell which.

August 4, 20266 min read
Troubleshooting
Troubleshooting

Actual Hours Appear With No Planned Hours: Causes and Fixes

A day showing logged actual hours with zero planned hours is usually an orphaned breakdown row from a step that was completed then dropped from the forward plan. How a clean run reconciles it.

August 4, 20266 min read
Scheduling Concepts
Scheduling Concepts

Does a Multi-Day Operation Set Up Again Each Day?

Why setup is incurred once at the start of an operation, not repeated each morning a multi-day run continues, and how that differs from a changeover between two different operations.

August 4, 20268 min read
Scheduling Concepts
Scheduling Concepts

Earliest Start vs Earliest Completion Machine Selection

The three strategies EDGEBIC uses to pick a machine from a pool or alternate list, why earliest start and earliest completion can disagree, and the day-granular quirk that decides the winner.

August 4, 20268 min read
Scheduling Concepts
Scheduling Concepts

Efficiency vs Utilization: Two Different Capacity Dials

Why efficiency and utilization are separate things in EDGEBIC: one scales the run time of the work and is set per pool member, the other scales the hours a work center offers and is shaped through the calendar.

August 4, 20268 min read