Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
Administering Scheduled ERP Syncs in EDGEBIC
How EDGEBIC's Integration tab runs scheduled and file-watched imports on interval, keeps run history, monitors live runs, and lets you test a sync with the built-in simulator.
Backward Scheduling a Job From Its Due Date in EDGEBIC
Schedule a 40-piece order backward so it finishes just in time, reserve the delivery lead time, and see what happens when the plan does not fit, with full date arithmetic.
Building a Master Production Schedule in EDGEBIC, Bucket by Bucket
Read the MPS grid for a stocked product, catch a projected stockout, commit a build quantity, and firm it into a scheduled build-to-stock order in EDGEBIC, with every number shown.
CSV vs Database View: ERP Export Tradeoffs for EDGEBIC
When to feed EDGEBIC a CSV or Excel file versus a read-only database view: inspectability, automation, permissions, and how the import mask handles both the same way.
Deactivating Users and Offboarding in EDGEBIC
How to offboard someone from EDGEBIC the right way: deactivate rather than delete, reassign their work, and keep the audit trail attributable, all through users and roles.
EDGEBIC Actual Live Monitoring Explained: Progress on the Routing
How the EDGEBIC live actual view overlays real progress onto a job's routing diagram, so you watch actual against planned step by step on a read-only board that changes nothing.
EDGEBIC Daily Capacity Overrides Explained: Change One Day's Hours
How EDGEBIC lets you override a single work center's capacity for a single day, for overtime or a short shift, without editing the standing shift calendar, and how the override wins where it applies.
EDGEBIC + ECI M1: The Complete Scheduling Integration Guide
ECI M1 production scheduling integration with EDGEBIC: export items, work centers, routings and jobs to CSV, map columns once, and schedule at finite capacity.
EDGEBIC + Fulcrum: The Complete Scheduling Integration Guide
Fulcrum production scheduling integration with EDGEBIC: export items, work centers, routings and work orders to CSV, map columns once, and schedule at finite capacity.
The EDGEBIC Gantt View Explained: Plan vs Actual on One Timeline
How the EDGEBIC Job Gantt view shows the plan and the reality on one bar chart, with routing dependencies drawn between operations and drag-to-reschedule that stages before it commits.
EDGEBIC + Genius ERP: The Complete Scheduling Integration Guide
Genius ERP production scheduling integration with EDGEBIC: export items, work centers, routings and jobs to CSV, map columns once, and schedule at finite capacity.
EDGEBIC Grid Layout Persistence Explained: Your Columns, Remembered
How EDGEBIC remembers each user's column widths, order, and sorting on every grid, and why a new column still shows up even after you have customized the layout.
