Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

A Go-Live Cutover Plan for Your ERP and EDGEBIC

A staged cutover plan for running EDGEBIC alongside your ERP: parallel run, the trust checks that end it, who owns which data, and the first week the schedule is official.

August 7, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

An ERP Import Reconciliation Checklist for EDGEBIC

The checks to run after every ERP import into EDGEBIC: row counts, Created versus Reused, orphan work centers, routing chain gaps, and hours that do not reconcile.

August 7, 20268 min read
Shop Floor Execution
Shop Floor Execution

Building a Reason Code Catalog for Your Work Centers in EDGEBIC

EDGEBIC ships 16 default reason codes across four categories and lets you add work center specific ones. Here is how to build a catalog operators will actually use.

August 7, 20267 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Building a Work Center List When Your ERP Has None

How to create a scheduling-grade work center list when your ERP has no resource master: what to include, how many instances to declare, and how to import it into EDGEBIC.

August 7, 20268 min read
Schedule Optimization
Schedule Optimization

Comparing Two Optimizer Runs Before You Commit

Running the optimizer twice with different goals costs a minute and shows you the trade space. Here is how to compare two proposals and pick the one to accept.

August 7, 20267 min read
Schedule Optimization
Schedule Optimization

Does Running the Optimizer Disturb Your Plant?

A run holds everything in memory, locks nothing, and is invisible to other users until you accept. Here is exactly what a run touches and what it leaves alone.

August 7, 20267 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

EDGEBIC + Cetec ERP: The Scheduling Integration Guide

Cetec ERP production scheduling integration with EDGEBIC: export parts, work centers, routings and open work orders, map columns once, then schedule at finite capacity.

August 7, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Agricultural Equipment Builds Around In-Season Parts Rushes

Agricultural equipment scheduling that protects the whole-goods build line while absorbing in-season service parts rushes, using alternates and honest what-if reschedules.

August 7, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Boat Building Around Molds, Cure Time, and Launch Dates

Boat building scheduling that counts hulls molds as finite units, carries lamination cure as real elapsed time, and works backward from each customer launch date.

August 7, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Conveyor and Material Handling Equipment by Ship Set

Conveyor manufacturing scheduling that holds a ship set together, overlaps fabrication with transfer batches, and works backward from each installation start date.

August 7, 20268 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Dental Labs by Case Due Date

Dental lab scheduling that works backward from each case ship date, routes work to certified technicians, and holds thousands of one-off cases to promised days.

August 7, 20267 min read
Industry Applications (EDGEBIC)
Industry Applications (EDGEBIC)

Scheduling Electrical Enclosure Fabrication From Punch to Wire-Out

Electrical enclosure scheduling that overlaps punch and brake with weld, batches powder coat by color, and times wire-out sub-assemblies to the final build date.

August 7, 20268 min read
Let's Solve Your Challenges Together