Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Admin & Deployment
Admin & Deployment

Why Your ERP Sync Belongs on a Server, Not a Workstation

By default any open EDGEBIC workstation can dispatch scheduled integrations. On a shared database that is the wrong place for them. What the always-on sync host does and how to hand hosting over to it.

August 10, 20268 min read
Troubleshooting
Troubleshooting

A Make-to-Stock Product Cannot Hold Inventory: Causes and Fixes

When a make-to-stock product has the stocked flag off, builds post no receipts and nothing nets against it. How to spot the mismatch and turn stocking back on.

August 9, 20266 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

A Monthly ERP to EDGEBIC Data Audit

A 45 minute monthly audit that catches the slow drift a per-import check misses: phantom work centers, stale jobs, reverted instance counts, and standard times reality has moved past.

August 9, 20268 min read
Troubleshooting
Troubleshooting

A Product Yield Value Is Out of Range: Causes and Fixes

Yield must sit between zero and one. A yield of zero blocks the build quantity calculation and a yield above one inflates nothing. How to spot and correct both.

August 9, 20266 min read
Troubleshooting
Troubleshooting

A Run Failed With a Resource Shift Mismatch: Causes and Fixes

A shift mismatch means a slot was allocated and then rejected because it fell outside every configured shift. How it differs from no capacity and how to fix it.

August 9, 20266 min read
Troubleshooting
Troubleshooting

A Satisfied-From-Stock Job Did Not Draw Down Inventory: Causes and Fixes

When a job is marked satisfied from stock but the ledger shows no consumption, on-hand is overstated. Why the issue entry goes missing and how to post it.

August 9, 20266 min read
Troubleshooting
Troubleshooting

A Satisfied-From-Stock Job Still Shows a Work Center Row: Causes and Fixes

A fully covered job should carry one material-shaped row and no machine work. Why a work center row appears on it and what it breaks downstream.

August 9, 20266 min read
Troubleshooting
Troubleshooting

A Work Center Is Booked Past Its Shift Design: Causes and Fixes

A warning that daily bookings exceed the shift-design cap means planned overtime or a stale shift setting, not a physically impossible schedule. How to tell which.

August 9, 20266 min read
Troubleshooting
Troubleshooting

Anomaly Checks Show Nothing When I Filter to One Job: Causes and Fixes

Inventory and setup matrix anomaly checks return no rows on a single-job scan because they are plant-wide. How to read the chip strip and pick the right scope.

August 9, 20266 min read
Admin & Deployment
Admin & Deployment

Choosing a Safe Change Window in EDGEBIC

Which EDGEBIC admin changes need everyone signed out, which take effect at the next sign-in, and which land on the next scheduler run. A timing table for planning your changes.

August 9, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Choosing the System of Record for Each Scheduling Field

Decide which fields your ERP owns and which EDGEBIC owns before the second import: the mapping rule that stops a nightly export from overwriting your machine counts and setups.

August 9, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Deciding Which ERP Work Orders to Import

How to filter an ERP work order export for scheduling: which statuses belong in the plan, why MRP planned orders usually do not, and why a status filter beats a date window.

August 9, 20268 min read