Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Worked Examples
Worked Examples

Overlapping Operations with Lot Streaming: An EDGEBIC Example

A lot streaming production scheduling example: 1,000 pieces, cut then drill, and how a 100-piece transfer batch lets EDGEBIC save a full day of lead time.

July 23, 202612 min read
Worked Examples
Worked Examples

A Machine Breaks at 10 AM: Rescheduling Without Losing the Morning

How to reschedule production after machine breakdown: a walkthrough where logged work stays frozen, the down day is skipped, and the job still ships early.

July 23, 202610 min read
Worked Examples
Worked Examples

A Make-to-Stock Replenishment Cycle in EDGEBIC, Step by Step

Make to stock replenishment scheduling walkthrough: a safety-stock breach, a firmed build order, a 4.5-hour press run, and the receipt that restores stock.

July 23, 202611 min read
Worked Examples
Worked Examples

The Paint-Booth Math: Sequence-Dependent Changeovers in EDGEBIC

Sequence dependent setup time scheduling, worked in full: six paint jobs, one booth, and how EDGEBIC's setup matrix cuts changeover from 630 to 90 minutes.

July 23, 202612 min read
Worked Examples
Worked Examples

Half-Done Is Not Undone: Rescheduling Partially Completed Jobs in EDGEBIC

How to reschedule a partially completed production order: EDGEBIC locks 4 logged hours as history and forward-shifts the remaining 15.2, step by step.

July 23, 202611 min read
Worked Examples
Worked Examples

Quote to Ship in EDGEBIC: A Custom Order's Complete Journey

Follow the quote to ship manufacturing process end to end in EDGEBIC: simulation, pricing, conversion, scheduling, shop-floor actuals, and on-time proof.

July 23, 202611 min read
Visual Scheduling
Visual Scheduling

Reading the EDGEBIC Gantt: Planned vs Actual at a Glance

Read a planned vs actual Gantt chart in manufacturing: EDGEBIC keeps plan and real dates side by side, so every bar shows plan, reality, and progress.

July 23, 202610 min read
Troubleshooting
Troubleshooting

Idle Gaps in the Schedule: Waste or By Design?

Gaps in a production schedule can be queue buffers, shift boundaries, or real waste. How to tell intentional gaps from lost capacity, and what to do about each.

July 23, 20266 min read
Troubleshooting
Troubleshooting

Steps Scheduled Out of Sequence: Diagnosing Dependency Problems

Operations scheduled out of order have four causes: display sorting, intentional overlap, broken step links, or a real violation. How to tell them apart fast.

July 23, 20267 min read
Visual Scheduling
Visual Scheduling

Modeling Sub-Assemblies on the EDGEBIC Design Canvas

Sub assembly routing scheduling in EDGEBIC: connect a component with its own routing into a parent and the scheduler explodes and times every level.

July 23, 20269 min read
Worked Examples
Worked Examples

Scheduling Synchronized Multi-Spindle Operations in EDGEBIC

A synchronized machine scheduling walkthrough: three ganged drill heads start together, finish together, and mirror one parent schedule in EDGEBIC.

July 23, 202611 min read
Worked Examples
Worked Examples

Scheduling Around the Bottleneck: A TOC Anchor Example in EDGEBIC

A theory of constraints scheduling example: EDGEBIC pins a bottleneck CNC to a target date, schedules feeders backward and finishers forward.

July 23, 202612 min read
Let's Solve Your Challenges Together