Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
EDGEBIC + Fourth Shift: The Complete Scheduling Integration Guide
Fourth Shift scheduling integration with EDGEBIC: the vendor-recommended lineage, the 5-day Plastilite benchmark, and the import-mask steps to schedule from your data.
The Safety Prompts That Keep Gantt Drags Honest in EDGEBIC
Prevent scheduling errors gantt drag mistakes cause: EDGEBIC's prior-operations prompt, target-date warnings, and hard validations keep manual moves honest.
A Tour of the EDGEBIC Graphical Routing Designer
Tour the graphical routing editor in EDGEBIC: toolbox, canvas, properties panel, connector types, node tooltips, validation, and Excel export, panel by panel.
From Empty Plant to First Schedule: An EDGEBIC Greenfield Walkthrough
Setting up scheduling software from scratch: follow one plant from an empty database to its first committed schedule in EDGEBIC, with every number shown.
EDGEBIC + JobBOSS: The Complete Scheduling Integration Guide
JobBOSS scheduling software integration with EDGEBIC, step by step: export jobs and routings, map columns once with import masks, and send finite capacity dates back.
Editing a Live Job's Routing in EDGEBIC (Safely)
Edit routing on active production order safely: EDGEBIC freezes a per-job routing copy, so you change one live job deliberately and history stays intact.
Epicor Kinetic Scheduling Gaps (And How EDGEBIC Fills Them)
Epicor Kinetic scheduling gaps mapped to fixes: resource pools that re-shop, sequence-dependent setup optimization, and reschedules that never move completed work.
The 5-Day ERP Integration: The Fourth Shift Story Behind EDGEBIC's Approach
Fast ERP scheduling integration, proven: how a Fourth Shift ERP integration ran Monday to Friday at Plastilite, and how EDGEBIC's import masks industrialize that method.
Making the Gantt Speak: Colors, Labels, and Layouts in EDGEBIC
Gantt chart color coding production teams actually read: EDGEBIC operation states, configurable bar captions with hour tokens, and self-saving layouts.
How to Build a Routing as a Flow Chart in EDGEBIC
Build a manufacturing routing flow chart in EDGEBIC: drag work centers onto a canvas, connect steps with arrows, and schedule straight from the diagram.
A Job Got Scheduled on a Holiday: Here's Why
A job scheduled on a holiday almost always means the calendar changed after the scheduling run. The four holiday layers, how to confirm, and the one-step fix.
JobBOSS Scheduling Gaps (And How Job Shops Fill Them)
JobBOSS finite capacity scheduling gaps explained: where ERP scheduling stops, why whiteboards take over, and how job shops add a real scheduling layer.