Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Admin & Deployment
Admin & Deployment

Eight User and Permission Mistakes in EDGEBIC (and How to Fix Them)

The user permission mistakes software admins repeat: shared logins, roles that never got the new rights, and a reset button that clears data. With fixes.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

What a Scenario Can and Cannot Change in EDGEBIC

The documented scenario planning limits in manufacturing what-if analysis: which levers a scenario controls, which it never touches, and why.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

What the EDGEBIC Schedule Checks Actually Look For

Schedule data quality checks in plain language: over-booking, machine collisions, off-calendar work, consistency drift, and the thresholds behind each finding.

July 24, 202612 min read
EDGEBIC Platform
EDGEBIC Platform

Why Every EDGEBIC Column Carries Its Own Definition

A manufacturing report glossary that cannot drift: how EDGEBIC structures every column definition, validates their links, and what that buys you in an audit.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

Routing Version Control for Manufacturing: Snapshot vs Live Routing

Routing version control in manufacturing: how a job's frozen copy is chosen over the live routing, the three authorized writes, and the hybrid merge rules.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Nine Work Center Configuration Mistakes and What They Look Like

Work center configuration mistakes are quiet: wrong instance counts, mixed machine pools, per-machine overrides, stale calendars. The symptom and fix for each.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Work Center Group Mistakes (And How to Spot Them)

The work center group mistakes that produce confusing schedules in EDGEBIC: wrong model, invented factors, deactivated pools, and the symptom for each.

July 24, 20268 min read
Troubleshooting
Troubleshooting

Actual Dates Look Wrong: Tracing What the Shop Floor Really Reported

Actual dates wrong in production tracking? Auto-filled steps, end-of-day stamps, and mirrored parallel dates explain most cases. Trace each to its source.

July 23, 20267 min read
Troubleshooting
Troubleshooting

A Work Center Shows Zero Capacity: The Checklist

Work center zero capacity is almost always configuration: instances, shifts, daily hours, calendars, or utilization. The six-point checklist that finds it fast.

July 23, 20266 min read
Worked Examples
Worked Examples

Consume From Stock: How EDGEBIC Nets Demand Against Inventory

Inventory netting production scheduling walkthrough: three orders, 80 units on hand, and how EDGEBIC decides which jobs build and which consume stock.

July 23, 202611 min read
Visual Scheduling
Visual Scheduling

Drag-and-Drop Rescheduling in EDGEBIC: Modes, Rules, and Ripples

Drag and drop production rescheduling in EDGEBIC: three drag modes, staged saves, downstream flags, and a targeted re-plan that spares the rest of the plant.

July 23, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

EDGEBIC + Epicor: The Complete Scheduling Integration Guide

Epicor scheduling add-on integration with EDGEBIC explained: export items, routings, and orders, map columns once with import masks, schedule finite capacity, send dates back.

July 23, 202610 min read
Let's Solve Your Challenges Together